My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Marion Street Pedestrian Bridge Proj No. 123-060 – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Marion Street Pedestrian Bridge Proj No. 123-060 – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:23:00 PM
Creation date
11/14/2023 2:22:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 12 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />A1.04 PROJECT MANAGEMENT <br />Facilitate and attend monthly project meetings with the OWNER and other interested agencies. <br />Prepare project status reports and invoices. Perform general project coordination and overall <br />management of the consultant design team. <br />A1.05 SERVICES NOT BEING PERFORMED BY ENGINEER UNDER THIS AGREEMENT <br /> Any services not specifically included above are not included in Engineer’s Scope of Services <br />being provided under this Agreement. The services not being provided under this Agreement <br />include, but are not limited to, the following: <br />1. Geotechnical Investigation and Report <br />2. Permitting <br />3. Utility Coordination Services <br />4. Environmental Services <br />5. Administering, and/or attending an informal public information meeting <br />6. Prepare for, advertise, administer, and attend a public hearing <br />7. Right-of-Way Engineering <br />8. Right-of-Way Acquisition Services <br />9. Providing any type of property surveys and staking to enable contractor(s) to proceed <br />with their work; and providing other special field surveys <br />10. Construction Inspection Services <br />11. Construction Phase Office Services <br />12. Bridge Design <br />13. Roadway Design <br />14. Preparation of plans in accordance with INDOT requirements for a federally funded <br />project. <br />A1.06 SCHEDULE <br /> Topographic Survery within 45 days of Notice to Proceed <br /> Hydraulic Scour Analysis within 90 days of Topographic Survey Completion <br /> Alternative Analysis (Bridge and Road) within 90 days of Topographic Survey completion
The URL can be used to link to this page
Your browser does not support the video tag.