Laserfiche WebLink
REGULAR MEETING <br />Five percent (5 %) Bid Bond was submitted <br />Base Bid <br />$680,200.00 <br />Alternate 1 <br />$321,550.00 <br />Alternate 2 <br />$23,645.00 <br />Alternate 3 <br />$84,000.00 <br />Alternate 4 <br />$33,305.00 <br />Total Plus All Alternates <br />$1,142,700.00 <br />UP -1 <br />$1,975.00 <br />FEBRUARY 26 2013 43 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above bids were <br />referred to Engineering, Century Center, and the Energy Department for review and <br />recommendation. <br />AWARD BID AND APPROVE CONTRACT --- COMPRESSED NATURAL GAS FUELING <br />S_ KID (2013 CAPITAL) <br />Mr, Matt Chlebowski, Central Services, advised the Board that on February 12, 2013, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. <br />Chlebowski recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, Most Energy, LLC, 3510 Parmenter Street, Middleton, Wisconsin, 53562, in <br />the amount of $39,950.00. Therefore, Ms. Roos made a motion that the recommendation be <br />accepted and the bid be awarded and the contract approved as outlined above. Mr. Inks seconded <br />the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — IGNITION PARK PHASE 1B MASS <br />GRADING —PROJECT NO 112 -072 (AEDA TIM <br />Mr. Patrick Henthorn, Engineering, advised the Board that on February 12, 2013, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Henthorn <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Selge Construction Co., Inc., 2833 South 111h Street, Niles, Michigan 49120, in the amount of <br />$381,59136. Therefore, Mr. Inks made a motion that the recommendation be accepted and the <br />bid be awarded and the contract approved as outlined above. Ms. Roos seconded the motion, <br />which carried. <br />AWARD BID AND APPROVE CONTRACT — MAIN STREET /LAFAYETTE BOULEVARD <br />CONNECTOR — PROJECT NO. 110 -058B SSDA TIF <br />Mr. Patrick Henthorn, Engineering, advised the Board that on February 12, 2013, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Henthorn <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Rieth -Riley Construction Co., Inc., 25200 State Road 23, PO Box 1775, South Bend, Indiana <br />46614, in the amount of $3,739,868.46 which is the Base Bid with Alternates No. I and No. 2. <br />Therefore, Ms. Roos made a motion that the recommendation be accepted and the bid be <br />awarded and the contract approved as outlined above. Mr. Inks seconded the motion, which <br />carried. <br />AWARD BID AND APPROVE CONTRACT — PINHOOK WATER TREATMENT PLANT <br />EFFICIENCY IMPROVEMENTS —PROJECT NO, 112 -062 BOND <br />Mr. John Wiltrout, Water Works, advised the Board that on February 12, 2013, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Wiltrout <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />L.D. Docsa Associates, Inc., 1605 King Highway, Kalamazoo, Michigan, 49001, in the amount <br />of $3,260,426.00, which is the Base Bid plus Unit Price Items, Alternate No. 2 and Alternate No. <br />4. Therefore, Ms. Roos made a motion that the recommendation be accepted and the bid be <br />awarded and the contract approved subject to approval by the Public Work's Director. Mr. Inks <br />seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 4 FINAL AND PROJECT COMPLETION AFFIDAVIT <br />— EAST BANK SEWER SEPARATION PHASE III — PROJECT NO. 111 -069 2012 SEWER <br />BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 4 (Final) on <br />behalf of Rieth -Riley Construction Co., Inc. 25200 State Road 23, PO Box 1775, South Bend, <br />