Laserfiche WebLink
1 Construction Engineering 1 LS $21,700.00 $21,700.00 $18,300.00 $18,300.00 $17,500.00 $17,500.00 $18,500.00 $18,500.00 <br />2 Mobilization and Demobilization 1 LS $36,200.00 $36,200.00 $141,687.98 $141,687.98 $60,000.00 $60,000.00 $83,500.00 $83,500.00 <br />3 Clearing Right of Way 1 LS $14,500.00 $14,500.00 $24,800.00 $24,800.00 $13,000.00 $13,000.00 $204,000.00 $204,000.00 <br />4 Excavation, Common 2462 CYS $97.00 $238,814.00 $46.30 $113,990.60 $45.00 $110,790.00 $39.00 $96,018.00 <br />5 Linear Grading 340 LFT $9.00 $3,060.00 $19.50 $6,630.00 $20.00 $6,800.00 $80.00 $27,200.00 <br />6 B-Borrow 2100 CYS $28.00 $58,800.00 $9.00 $18,900.00 $48.00 $100,800.00 $24.00 $50,400.00 <br />7 SubGrade Treatment, Type II 2452 SYS $20.00 $49,040.00 $29.00 $71,108.00 $12.00 $29,424.00 $43.65 $107,029.80 <br />8 Compacted Aggregate, No. 53 817 TON $39.00 $31,863.00 $56.00 $45,752.00 $95.00 $77,615.00 $90.50 $73,938.50 <br />9 HMA Surface, PG70-22P, 9.5mm, Type C 63 TON $124.00 $7,812.00 $320.00 $20,160.00 $365.00 $22,995.00 $320.00 $20,160.00 <br />10 HMA Intermediate, PG64-22, 12.5 mm, Type C 105 TON $111.00 $11,655.00 $192.00 $20,160.00 $255.00 $26,775.00 $192.00 $20,160.00 <br />11 HMA Base, PG 64-22, 25.0 mm, Type C 336 TON $103.00 $34,608.00 $144.00 $48,384.00 $180.00 $60,480.00 $144.00 $48,384.00 <br />12 Joint Adhesive, Surface 216 LFT $1.00 $216.00 $0.10 $21.60 $5.00 $1,080.00 $0.10 $21.60 <br />13 Joint Adhesive, Intermediate 216 LFT $1.00 $216.00 $0.10 $21.60 $5.00 $1,080.00 $0.10 $21.60 <br />14 Liquid Asphalt Sealant 216 LFT $1.00 $216.00 $0.10 $21.60 $5.00 $1,080.00 $0.10 $21.60 <br />15 Asphalt for Tack Coat 1,526 SYS $1.00 $1,526.00 $0.10 $152.60 $5.00 $7,630.00 $0.10 $152.60 <br />16 PCCP, 11.5"1,305 SYS $163.00 $212,715.00 $124.20 $162,081.00 $180.00 $234,900.00 $221.00 $288,405.00 <br />17 PCCP, For Patching 384 SYS $305.00 $117,120.00 $142.70 $54,796.80 $200.00 $76,800.00 $234.00 $89,856.00 <br />18 D-1 Contraction Joint 891 LFT $18.00 $16,038.00 $18.00 $16,038.00 $28.00 $24,948.00 $20.75 $18,488.25 <br />19 Type A Expansion Joint W/Dowels 168 LFT $60.00 $10,080.00 $28.00 $4,704.00 $50.00 $8,400.00 $43.00 $7,224.00 <br />20 Type E Longitudinal Construction Joints 672 LFT $21.00 $14,112.00 $14.00 $9,408.00 $20.00 $13,440.00 $7.00 $4,704.00 <br />21 Center Curb, Concrete 3 SYS $204.00 $612.00 $600.00 $1,800.00 $1,500.00 $4,500.00 $465.00 $1,395.00 <br />22 Curb, Integral, Concrete, 6in 56 LFT $58.00 $3,248.00 $56.00 $3,136.00 $100.00 $5,600.00 $90.00 $5,040.00 <br />23 Curb, Concrete 130 LFT $45.00 $5,850.00 $98.00 $12,740.00 $65.00 $8,450.00 $85.00 $11,050.00 <br />24 Sodding, Nursery 509 SYS $46.00 $23,414.00 $21.60 $10,994.40 $40.00 $20,360.00 $15.00 $7,635.00 <br />25 Topsoil 3 CYS $438.00 $1,314.00 $470.00 $1,410.00 $500.00 $1,500.00 $50.00 $150.00 <br />26 Pipe, Type 2, Circular 12 in 2 LFT $259.00 $518.00 $1,630.00 $3,260.00 $750.00 $1,500.00 $450.00 $900.00 <br />27 Pipe, Type 2, Circular w/Slotted Van Drain, 12 in 40 LFT $234.00 $9,360.00 $505.00 $20,200.00 $750.00 $30,000.00 $490.00 $19,600.00 <br />28 Pipe, Type 1, Field Verified 20 LFT $100.00 $2,000.00 $215.00 $4,300.00 $38.00 $760.00 $325.00 $6,500.00 <br />29 Pipe, End Section, Field Verified 2 EA $1,250.00 $2,500.00 $660.00 $1,320.00 $500.00 $1,000.00 $1,600.00 $3,200.00 <br />30 Casting, Inlet, Adjust to Grade 2 EA $915.00 $1,830.00 $700.00 $1,400.00 $1,500.00 $3,000.00 $900.00 $1,800.00 <br />31 Casting, Manhole, Adjust to Grade 1 EA $920.00 $920.00 $1,900.00 $1,900.00 $2,500.00 $2,500.00 $750.00 $750.00 <br />32 Line, Multi-Component, Broken, White 4 in.683 LFT $4.00 $2,732.00 $3.00 $2,049.00 $2.00 $1,366.00 $3.00 $2,049.00 <br />33 Line, Multi-Component, Sold, White 4 in 1,999 LFT $2.00 $3,998.00 $3.00 $5,997.00 $2.00 $3,998.00 $3.00 $5,997.00 <br />34 Line, Multi-Component, Solid, Yellow, 4 in 1,368 LFT $2.00 $2,736.00 $3.00 $4,104.00 $2.00 $2,736.00 $3.00 $4,104.00 <br />35 Line, Multi-Component, Solid, White 10 in 2,060 LFT $2.00 $4,120.00 $5.00 $10,300.00 $3.00 $6,180.00 $5.00 $10,300.00 <br />36 Grooving for Pavement Markings 6,110 LFT $2.00 $12,220.00 $1.60 $9,776.00 $2.00 $12,220.00 $1.60 $9,776.00 <br />37 Transverse Marking, Multi-Component, Crosshatch Line, White, 12 in 145 LFT $9.00 $1,305.00 $10.00 $1,450.00 $10.00 $1,450.00 $10.00 $1,450.00 <br />38 Transverse Marking, Multi-Component, Stop Line, White 24 in 207 LFT $10.00 $2,070.00 $17.00 $3,519.00 $25.00 $5,175.00 $17.00 $3,519.00 <br />39 <br />Pavement Message Marking, Multi-Component, Lane Indication <br />Arrow 3 EA $573.00 $1,719.00 $200.00 $600.00 $350.00 $1,050.00 $200.00 $600.00 <br />40 <br />Signal Head, 5-Section, 12", Red, Amber, Green, Amber Arrow, <br />Green Arrow 6 EA $1,085.00 $6,510.00 $1,400.00 $8,400.00 $2,200.00 $13,200.00 $1,400.00 $8,400.00 <br />41 Signal Head, 3-Section, 12", Red, Amber, Green 4 EA $1,700.00 $6,800.00 $2,100.00 $8,400.00 $3,200.00 $12,800.00 $2,100.00 $8,400.00 <br />42 Signal Cable, 5C/14 363 LFT $3.15 $1,143.45 $5.00 $1,815.00 $8.00 $2,904.00 $5.00 $1,815.00 <br />43 Signal Cable, 7C/14 242 LFT $4.28 $1,035.76 $6.00 $1,452.00 $9.00 $2,178.00 $6.00 $1,452.00 <br />44 Signal Cable, 9C/14 286 LFT $4.42 $1,264.12 $7.00 $2,002.00 $11.00 $3,146.00 $7.00 $2,002.00 <br />45 Existing Signal Equipment, Remove 1 EA $1,100.00 $1,100.00 $1,600.00 $1,600.00 $2,500.00 $2,500.00 $1,600.00 $1,600.00 <br />Selge <br />Unit Price Extension <br />South Bend - Cleveland Road and Ameritech Dr Intersection Improvements / 122-049 <br />Bid Tab <br />Unit Price Unit PriceITEM <br />Engineer's Estimate Reith-Riley Contruction Milestone Premium Concrete Services <br />Unit PriceESTIMATED <br />QUANTITY <br />Unit Price Extension ExtensionDESCRIPTION OF ITEM UNIT Extension Extension