46 Temporary Pavement Marking, Removeable, 4 in 15,731 LFT $2.00 $31,462.00 $1.85 $29,102.35 $3.00 $47,193.00 $1.85 $29,102.35
<br />47 Temporary Pavement Marking, Removeable, 24 in 181 LDT $12.00 $2,172.00 $11.10 $2,009.10 $18.00 $3,258.00 $11.10 $2,009.10
<br />48
<br />Temporary Pavement Marking, Removable, Lane Indication
<br />Arrow 16 EA $179.00 $2,864.00 $145.00 $2,320.00 $250.00 $4,000.00 $145.00 $2,320.00
<br />49 Line, Remove 1,785 LFT $1.00 $1,785.00 $1.35 $2,409.75 $2.00 $3,570.00 $1.35 $2,409.75
<br />50 Sign, Remove and Relocate 4 EA $140.00 $560.00 $400.00 $1,600.00 $650.00 $2,600.00 $400.00 $1,600.00
<br />51 Concrete Pavement Remove 1,305 SYS $27.00 $35,235.00 $37.10 $48,415.50 $50.00 $65,250.00 $34.00 $44,370.00
<br />52 Center Curb, Concrete, Remove 78 SYS $43.00 $3,354.00 $20.00 $1,560.00 $210.00 $16,380.00 $75.00 $5,850.00
<br />53 Curb Remove 70 LFT $17.00 $1,190.00 $50.00 $3,500.00 $28.00 $1,960.00 $30.00 $2,100.00
<br />54 Maintenance of Traffic 1 LS $72,400.00 $72,400.00 $288,000.00 $288,000.00 $320,000.00 $320,000.00 $269,200.00 $269,200.00
<br />55 Erosion Control 1 LS $7,300.00 $7,300.00 $1,041.12 $1,041.12 $7,500.00 $7,500.00 $3,000.00 $3,000.00
<br />NOTES: RIETH-RILEY's BID WAS NON-RESPONSIVE WITH SOME ITEM OMISSIONS, SEVERAL QUANTITY AND MATH ERRORS AND WAS NOT CONSIDERED
<br /> THERE WERE NO MATH ERRORS IN THE BIDS SUBMITTED BY THE 3 BIDDERS
<br />Certified MILESTONE IS THE LOWEST AND QUALIFIED BIDDER
<br /> Nitin V. Timble PE, LS Date 8/23/2023
<br />$1,639,630.15$1,138,932.33TOTAL BID (Items 1 to 18)$1,517,321.00$1,281,000.00
|