My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
insoluble in all common solvents. The resin shall be capable of 30,000 <br />grains per cubic foot capacity when regenerated with 15 lbs. NaCl.Resin. <br />E. ACCESSORIES <br />1. Pressure gauge for soft water outlet. <br />2. Sampling cocks for hard water inlet and soft water outlet. <br />F. FIELD SERVICE <br />1. The services of a factory authorized service representative shall be provided to <br />supervise, inspect and provide operator training as required for initial start-up <br />and system operation. <br />2. Provide reinspection of system operation and function, through a factory <br />authorized service representative, to be conducted six months and twelve months <br />after project completion. <br />3. Provide a Water-Hardness Testing Set: Manufacturer's standard testing apparatus <br />and chemicals with testing procedure instructions and metal container suitable <br />for wall mounting. <br />G. INSTRUCTIONS AND START UP <br />1. Provide necessary time to start up equipment and explain operation to owner. <br />2. Provide 3 sets of O & M manuals. Submit full and complete drawings of the <br />installation <br />3. Equipment shall be left when accepted by the Owner, with fresh charge of brine <br />and mineral reactivated. The Contractor shall instruct operating personnel in the <br />correct procedure for best operation <br />H. GUARANTEES <br />1. Attrition loss of mineral shall be guaranteed not to exceed 3% per year for a <br />period of three (3) years. <br />2. The manufacturer guarantees that, under actual operating conditions, the mineral <br />shall not be washed out of the system during the service run or backwashing <br />period; and that the turbidity and color of the effluent, by reason of passing <br />through the softener system, shall not be greater than the incoming water; and <br />that the underdrain system, gravel and minerals shall not become fouled, either <br />with turbidity or by dirt, rust or scale from the softening system while operating <br />as noted in the manufacturer’s instructions. <br />3. All equipment and service shall be guaranteed for a period of one (1) year from <br />the date of acceptance. <br />15420 - 3
The URL can be used to link to this page
Your browser does not support the video tag.