My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Pressure tanks shall include a five (5) year pro-rated warranty, from the date of <br />final acceptance. <br />I. Project Data: <br />Specified Hardness: PPM as CaCO3 460 <br />System Design, GPM Continuous Flow 175 <br />Maximum Pressure Drop Continuous PSI 15 <br />System Design, GPM Peak Flow 250 <br />Maximum Pressure Drop Continuous PSI 25 <br />System Design, Gallons per Day (maximum) 25,000/24Hrs. <br />Softener Capacity (per vessel)grains hardness 600,000 <br />Hours per Day:24 <br />Entering Water Temperature:50 <br />Salt Dosage: Pounds per Cubic Foot 15 <br />J. Electric Wiring: <br />1. Softener supplier shall complete wiring to softener. Include necessary wiring <br />and power for softener controls. <br />PART 3: EXECUTION <br />3.1 INSTALLATION AND COORDINATION <br />A. Verify exact layout requirements, and accessibility requirements for each item of <br />equipment. Make necessary modifications to layout in field, to assure accessibility and <br />clearances. <br />B. All work shall be in accordance with manufacturers’ installation requirements and <br />additional code requirements. <br />C. Maintain adequate service clearance around all equipment, including the work of other <br />trades. <br />D. Provide electrical wiring as required for the installation per the Indiana Electrical Code. <br />END OF SECTION <br />15420 - 4
The URL can be used to link to this page
Your browser does not support the video tag.