My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center Water Softener Replacement © Copyright, M/E Design Services <br />South Bend, Indiana September 5, 2023 <br /> <br /> <br />CLEANING 01710-1 <br />SECTION 01710 CLEANING <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SUMMARY <br /> <br />A. Throughout the construction period, maintain the buildings and site in a standard of <br />cleanliness as described in this Section. <br /> <br />B. Contractor shall not utilize Century Center dumpsters. <br /> <br />C. Related Work: <br /> <br />1. In addition to standards described in this Section, comply with requirements for <br />cleaning as described in pertinent other Sections of these Specifications. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 CLEANING MATERIALS AND EQUIPMENT <br /> <br />A. Provide required personnel, equipment and materials needed to maintain the specified <br />standard of cleanliness. <br /> <br />2.2 COMPATIBILITY <br /> <br />A. Use only the cleaning materials and equipment which are compatible with the surface <br />being cleaned, as recommended by the manufacturer of the material. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 PROGRESS CLEANING <br /> <br />A. General: <br /> <br />1. Retain stored items in an orderly arrangement allowing maximum access and <br />providing required protection of materials. <br /> <br />2. Do not allow accumulation of scrap, debris, waste material and other items. <br /> <br />3. At least each day, completely remove all scrap, debris and waste material from <br />the job site. <br /> <br />4. Provide adequate storage for all items awaiting removal from the job site, <br />observing requirements for fire protection and protection of the ecology. <br /> <br />3.2 FINAL CLEANING
The URL can be used to link to this page
Your browser does not support the video tag.