My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center Water Softener Replacement © Copyright, M/E Design Services <br />South Bend, Indiana September 5, 2023 <br /> <br /> <br />CLEANING 01710-2 <br /> <br />A. "Clean," for the purpose of this Article, and except as may be specifically provided <br />otherwise, shall be interpreted as meaning the level of cleanliness generally provided by <br />skilled cleaners using commercial quality building maintenance equipment and materials. <br /> <br />B. Prior to completion of the Work, remove from the job site all tools, surplus materials, <br />equipment, scrap, debris and waste. <br /> <br />3.3 CLEANING DURING OWNER'S OCCUPANCY <br /> <br />A. Should the owner occupy the Work or any portion thereof prior to its completion by the <br />Contractor and acceptance by the Owner, responsibilities for interim and final cleaning <br />shall be as determined by the Engineer/Owner. <br /> <br />END OF SECTION 01710 <br />
The URL can be used to link to this page
Your browser does not support the video tag.