My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WWTP DAF Building Improvements - Design Services Proj No. 123-031 – Black & Veatch Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
WWTP DAF Building Improvements - Design Services Proj No. 123-031 – Black & Veatch Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:23:08 PM
Creation date
7/25/2023 2:22:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 6 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />• Structural Plans, Sections and Details <br />• Electrical Power Plan and One-Line Diagrams <br />• Instrumentation Diagrams <br />• Technical Specifications including concrete, electrical, instrumentation, process <br />interconnections, and functional description <br />• Preliminary Opinion of Probable Construction Cost <br />90 Percent Design Deliverable (for both Bid Packages, as applicable) <br />• Construction Sequencing Plan <br />• Demolition Plans, Sections and Details <br />• Civil Plans, Sections and Details <br />• Process Mechanical Plans, Sections and Details <br />• Structural Plans, Sections and Details <br />• Electrical Power Plan, Schematic, Details and One-Line Diagrams <br />• Instrumentation Diagrams <br />• Technical Specifications including concrete, electrical, process interconnections, <br />instrumentation, and functional description <br />Five sets of drawings and specifications will be provided to the Owner at approximately 50 and 90 <br />percent completion milestones (total of 15 sets) for review and comment. The Owner will provide <br />comments to the Engineer within ten days of receipt of the drawings and specifications. Two sets <br />of the final drawings and specifications for each Bid Package will be provided for the Owner’s use, <br />as well as a PDF copy of the Contract Documents for bidding purposes. <br />Task 105 – Subconsultant Survey Services <br />A topographic survey will be performed by a qualified land surveyor to confirm existing facilities <br />controls and elevations between the Compressor Building and the Degrit Building along a corridor <br />in alignment with the existing primary pipe. The survey will also obtain current site contour <br />topographic information and drainage courses; floodplain information; establishment of control <br />points; inverts and locations of gravity storm drains and sanitary sewers; and at grade pavements, <br />fences, walls, stairs, etc. Additional surveying services can be provided as a supplemental service. <br />Task 106 – Permits Acquisition Assistance <br />To construct the required WAS thickening, and yard piping improvements permits for each Bid <br />Package may be needed. Engineer anticipates two needed permits from the City of South Bend, a <br />Construction in a Floodway permit from the Indiana Department of Natural Resources for Bid
The URL can be used to link to this page
Your browser does not support the video tag.