Laserfiche WebLink
<br /> <br />Page 5 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />• Electrical Legends <br />• Electrical Abbreviations and Notes <br />• Electrical Demolition Plan and Details <br />• Power Distribution Functional Diagram <br />• DAF Building Power Plan <br />• DAF Building MCC Power One-Line Diagram <br />• Schematic Diagrams <br />• Electrical Details <br />Instrumentation <br />• Instrumentation Abbreviations, Legends, and General Notes <br />• P&ID Legends and Abbreviations <br />• P&ID – WAS Thickening Equipment <br />• P&ID – Thickened Sludge Pumps <br />• Control Block Diagram <br />• Instrumentation Details <br />Contract Documents will be reviewed by senior engineers for quality assurance. The review will <br />cover conformance to standards, completeness, adherence to sound engineering practices, and <br />constructability. <br />Deliverables for the project include: <br />Basis of Design Memorandum Deliverable (one document covering both Bid Packages) <br />• Draft Basis of Design Memorandum <br />• Preliminary Opinions of Probable Construction Costs <br />50 Percent Design Deliverable (for Bid Package No. 2, only) <br />• Final Basis of Design Memorandum <br />• Preliminary Construction Sequencing Plan <br />• Civil and Mechanical Plans, Sections and Details