Laserfiche WebLink
<br /> <br />Page 4 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />including procurement of equipment. The Engineer’s Standard Documents will be used for <br />preparation of technical specifications and C-700 Standard General Conditions 2013 Edition will <br />be used for the front-end documents. <br />A Preliminary Drawing List for Bid Package No. 2 includes: <br />General <br />• Cover Sheet and Index of Drawings <br />• Index of Drawings, Abbreviations, Symbols and Legend <br />• General Civil and Process Mechanical Abbreviations <br />• Recommended Construction Sequence <br />Demolition <br />• DAF Building Plan <br />• DAF Building Sections <br />Civil <br />• Site Plan <br />Process Mechanical <br />• Mechanical Legends and General Notes <br />• WAS Thickening Equipment and Piping Plan <br />• WAS Thickening Pumping Plan <br />• WAS Thickening Equipment and Piping Sections <br />• Process Mechanical Details 1 of 2 <br />• Process Mechanical Details 2 of 2 <br />Structural <br />• Structural Abbreviations, Legends, and General Notes <br />• WAS Thickening Equipment Plan, Sections and Details <br />• Structural Details <br />Electrical