My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Industrial Water Softener Century Center Proj No. 123-041 – ME Design Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Industrial Water Softener Century Center Proj No. 123-041 – ME Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:16:58 AM
Creation date
7/11/2023 1:47:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. Compensation for Additional Services (as described in Exhibit A, Part 2) <br />Decision Question: Which method of compensation is to be used? <br />Standard Hourly Rates <br />Direct Labor Costs <br />Times a Factor <br />Salary Costs Times <br />a Factor <br />Use This Additional <br />Services <br />Packet AS-1 <br />Packet AS-2 <br />Packet AS-3 <br />Compensation <br />Packet <br />Include This <br />Appendices 1 and 2 <br />Appendix 1 <br />Appendix 1 <br />Appendix <br />Example: If Basic Services (other than RPR) will be compensated using Lump Sum; RPR services using Direct Labor Times a <br />Factor; and Additional Services using Standard Hourly Rates; then use Packet BC-1; Packet RPR4; Packet AS-1; and <br />Appendices 1 and 2 to form Exhibit C. <br />Page 2 <br />(Exhibit C—Compensation Decision Guide) <br />UCDC &500 A, ecoico t Between owner and Engineer for Professional Services. <br />Co,,rlght C 21108 National Society of Professional Engineers for MCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.