My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Industrial Water Softener Century Center Proj No. 123-041 – ME Design Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Industrial Water Softener Century Center Proj No. 123-041 – ME Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:16:58 AM
Creation date
7/11/2023 1:47:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated June 28, 2023. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services — Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 — OWNER'S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) — Lump Sum <br />Method ofPavment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer's Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $11,500.00 based on the following estimated distribution of <br />compensation: <br />a. Study and Report Phase $ -0- <br />b. Preliminary Design Phase $3.500.00 <br />c. Final Design Phase $4,700.00 <br />d. Bidding and Negotiating Phase $ 800.00 <br />e. Construction Phase $2,5 00.00 <br />f Post -Construction Phase $ -0- <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer's services and services of Engineer's <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />Pagel <br />Exhibit C—Compensation Packet BC-1: Basic Services (other than RPR)—Lump Sum Method of Payment <br />"CDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright O 2008 National Society of Professional Engineers for "CDC. AB rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.