My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Industrial Water Softener Century Center Proj No. 123-041 ā ME Design Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Industrial Water Softener Century Center Proj No. 123-041 ā ME Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:16:58 AM
Creation date
7/11/2023 1:47:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Compensation for Basic Services not including Resident Project Representative) (as described in Exhibit A, Part 1) <br />Decision Question: Which method of compensation is to be used? <br />Percentage of <br />Direct Labor <br />Direct Labor <br />Lump <br />Standard Hourly <br />Construction <br />Costs Times a <br />Costs Plus <br />Salary Costs <br />Sum <br />Rates <br />Costs <br />Factor <br />Overhead Plus a <br />Times a Factor <br />Fixed Fee <br />Use This Base <br />Packet <br />Compensation <br />BC -I <br />Packet BC-2 <br />Packet BC-3 <br />Packet BC-4 <br />Packet BC-5 <br />Packet BC-6 <br />Packet <br />Include This <br />N/A <br />Appendices 1 and 2 <br />N/A <br />Appendix 1 <br />Appendix 1 <br />Appendix 1 <br />Appendix <br />2. Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) <br />Decision Question: Which method of compensation is to be used? <br />Standard Hourly <br />Percentage of <br />Direct Labor Costs <br />Salary Costs Times a <br />Lump Sum <br />Rates <br />Construction <br />Times a Factor <br />Factor <br />Costs <br />Use This RPR <br />Compensation <br />Packet RPR-I <br />Packet RPR-2 <br />Packet RPR-3 <br />Packet RPR-4 <br />Packet RPR-5 <br />Packet <br />Include <br />N/A <br />anpdpendices 1 <br />N/A <br />Appendix I <br />Appendix I <br />endihis <br />Appendix <br />P,ke I <br />(EA0ft Cā Compensarnn Dndsiou Guide) <br />UCDC &500 Agreement Between O..nnr and Engineer for Professional Services. <br />Copyright 020N National Society orProfeesionnl Engineers for "CDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.