Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:59 PM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Activity IDActivity NameOriginalDurationStartFinishOS1060Backfill Structure122-Aug-2522-Aug-25OS1030Install 96" Flap Gate225-Aug-2526-Aug-25OS1040FRP Top Slab1027-Aug-2510-Sep-25OS1050Place Flow Channel311-Sep-2515-Sep-25Basin Control StructureBasin Control Structure3021-Oct-2402-Dec-24BC1000Excavate for Bason Control Structure521-Oct-2425-Oct-24BC1010Install Basin Pre-Fab Base Structure328-Oct-2430-Oct-24BC1020Install Piping, Valves, and Ladder531-Oct-2406-Nov-24BC1060Install Underground Lines to and from Structure1007-Nov-2420-Nov-24BC1050Backfill Structure221-Nov-2422-Nov-24BC1040Coat Interior Piping325-Nov-2427-Nov-24BC1030Install Top Slab and Actuator229-Nov-2402-Dec-24In Tek StructureIn Tek Structure1624-Dec-2416-Jan-25IT1000Shut Down Flow Thru Structure124-Dec-2424-Dec-24IT1010Remove Existing Top Slab326-Dec-2430-Dec-24IT1020Core/Install Sleeve for New 18" Drain Line131-Dec-2431-Dec-24IT1030Install New Pre-Cast Top Slab Planks302-Jan-2506-Jan-25IT1040FRP Concrete Collar at Pipe Sleeve207-Jan-2508-Jan-25IT1050Connect 18" Drain line from EQ Basin309-Jan-2513-Jan-25IT1060Backfill Structure314-Jan-2516-Jan-25DemolitionDemolition19216-Jan-2515-Oct-25D1000Setup Bypass System at Structure 72016-Jan-2512-Feb-25D1010Remove Parshall Flume from Service113-Feb-2513-Feb-25D1020Demo Parshall Flume Structure and Piping1514-Feb-2506-Mar-25D1030Demo Existing Overflow Structure1507-Mar-2527-Mar-25D1040Remove CSO Bypass System2018-Sep-2515-Oct-25FINAL CLARIFIER 1,2,3 CONSTRUCTIONFINAL CLARIFIER 1,2,3 CONSTRUCTION26121-Oct-2428-Oct-25MobilizationMobilization25621-Oct-2421-Oct-25MC1000Setup Laydown Yard1521-Oct-2408-Nov-24MC1010Mobilize Equipment & Materials1011-Nov-2422-Nov-24MC1020Setup Dewatering Wells and System1511-Nov-2402-Dec-24MC1050LOTO/Drain/Clean Existing Clarifiers1017-Dec-2431-Dec-24MC1030Remove/Restore Laydown Yard1024-Sep-2507-Oct-25MC1040Demobilize Equipment1008-Oct-2521-Oct-25Final Clarifier 1Final Clarifier 113602-Jan-2514-Jul-25DemolitionDemolition2502-Jan-2505-Feb-25DFC1000Disconnect/Remove Electrical Conduit/Connections502-Jan-2508-Jan-25DFC1010Remove Existing Clarifier Equipment509-Jan-2515-Jan-25DFC1020Remove Existing Handrail & Grating516-Jan-2522-Jan-25DFC1030Remove Existing Fillet Concrete1016-Jan-2529-Jan-25DFC1040Sawcut Bottom Slab for New 36" Influent Pipe530-Jan-2505-Feb-25DFC1050Sawcut Slab for RAS Piping530-Jan-2505-Feb-25New ConstructionNew Construction11106-Feb-2514-Jul-25FC1510Install Auger Support Piles1006-Feb-2519-Feb-25FC1000Install New 36" Influent Pipe/Replace Slab1520-Feb-2512-Mar-25FC1010Modify RAS Piping/Replace Slab820-Feb-2503-Mar-25FC1020FRP Slab at Influent 36" Piping113-Mar-2513-Mar-25FC1030FRP Influent Box Walls1514-Mar-2503-Apr-25FC1070Repair Existing Concrete Walls, Cracks, and Anchors2014-Mar-2510-Apr-25FC1040FRP Concrete Launder Troughs and Walls2004-Apr-2501-May-25FC1060Grout Fill at Bottom of Clarifier Tank1011-Apr-2524-Apr-25FC1050CLSM Fill & Top Slab at Existing Conc Troughs518-Apr-2524-Apr-25FC1080Install Protective Slurry Mortar1025-Apr-2508-May-25FC1090Install New Clarifier Equipment2009-May-2506-Jun-25FC1100Install New Clarifier Bridge1023-May-2506-Jun-25FC1120Install New Effluent Baffles1002-Jun-2513-Jun-25FC1130Install New Handrail and Grating509-Jun-2513-Jun-25FC1140Rough In Electrical Conduit and Wiring1509-Jun-2527-Jun-25FC1150Install Clarifier Controls and Instruments1509-Jun-2527-Jun-25FC1110Install New Clarifier Influent Gate523-Jun-2527-Jun-25FC1160Electrical Terminations, Fixtures, and Testing1030-Jun-2514-Jul-25Final Clarifier 2Final Clarifier 213606-Feb-2518-Aug-25DemolitionDemolition2506-Feb-2512-Mar-25DFC1060Disconnect/Remove Electrical Conduit/Connections506-Feb-2512-Feb-25DFC1070Remove Existing Clarifier Equipment513-Feb-2519-Feb-25DFC1080Remove Existing Handrail & Grating520-Feb-2526-Feb-25DFC1090Remove Existing Fillet Concrete1020-Feb-2505-Mar-25DFC1100Sawcut Bottom Slab for New 36" Influent Pipe506-Mar-2512-Mar-25DFC1110Sawcut Slab for RAS Piping506-Mar-2512-Mar-25New ConstructionNew Construction11113-Mar-2518-Aug-2512001230122011200122011201123012201120112301220112001230122011200122012201120012201120012001230122011200122012201123012201120012301220112001200122011201123012201120012301July 2023ASONDJFMApril 2024May 2024JJuly 2024ASONDJFMApril 2025May 2025JJuly 2025ASONDJFMApril 2026May 2026JJuly 2026ASBackfill StructureInstall 96" Flap GateFRP Top SlabPlace Flow Channel02-Dec-24, Basin Control StructureExcavate for Bason Control StructureInstall Basin Pre-Fab Base StructureInstall Piping, Valves, and LadderInstall Underground Lines to and from StructureBackfill StructureCoat Interior PipingInstall Top Slab and Actuator16-Jan-25, In Tek StructureShut Down Flow Thru StructureRemove Existing Top SlabCore/Install Sleeve for New 18" Drain LineInstall New Pre-Cast Top Slab PlanksFRP Concrete Collar at Pipe SleeveConnect 18" Drain line from EQ BasinBackfill Structure15-Oct-25, DemolitionSetup Bypass System at Structure 7Remove Parshall Flume from ServiceDemo Parshall Flume Structure and PipingDemo Existing Overflow StructureRemove CSO Bypass System28-Oct-25, FINAL CLARIFIER 1,2,3 CONSTRUCTION21-Oct-25, MobilizationSetup Laydown YardMobilize Equipment & MaterialsSetup Dewatering Wells and SystemLOTO/Drain/Clean Existing ClarifiersRemove/Restore Laydown YardDemobilize Equipment14-Jul-25, Final Clarifier 105-Feb-25, DemolitionDisconnect/Remove Electrical Conduit/ConnectionsRemove Existing Clarifier EquipmentRemove Existing Handrail & GratingRemove Existing Fillet ConcreteSawcut Bottom Slab for New 36" Influent PipeSawcut Slab for RAS Piping14-Jul-25, New ConstructionInstall Auger Support PilesInstall New 36" Influent Pipe/Replace SlabModify RAS Piping/Replace SlabFRP Slab at Influent 36" PipingFRP Influent Box WallsRepair Existing Concrete Walls, Cracks, and AnchorsFRP Concrete Launder Troughs and WallsGrout Fill at Bottom of Clarifier TankCLSM Fill & Top Slab at Existing Conc TroughsInstall Protective Slurry MortarInstall New Clarifier EquipmentInstall New Clarifier BridgeInstall New Effluent BafflesInstall New Handrail and GratingRough In Electrical Conduit and WiringInstall Clarifier Controls and InstrumentsInstall New Clarifier Influent GateElectrical Terminations, Fixtures, and Testing18-Aug-25, Final Clarifier 212-Mar-25, DemolitionDisconnect/Remove Electrical Conduit/ConnectionsRemove Existing Clarifier EquipmentRemove Existing Handrail & GratingRemove Existing Fillet ConcreteSawcut Bottom Slab for New 36" Influent PipeSawcut Slab for RAS Piping18-Aug-25, New ConstructionSouth Bend WWTP EQ Basin Clarifier ProjectHID23058Primary Baseline View10-Jul-23 13:45Actual WorkRemaining WorkCritical Remaining WorkMilestoneSummaryPage 4 of 5TASK filters: In Progress, Not Started.© Oracle Corporation