Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:59 PM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Activity IDActivity NameOriginalDurationStartFinishE1030Excavate/Grade Retention Pond2503-Dec-2408-Jan-25E1040Excavate/Prep/Place Concrete Pavement2527-Aug-2501-Oct-25E1060Rough Grade Site2027-Aug-2524-Sep-25E1050Excavate/Prep/Place Asphalt Path2002-Oct-2529-Oct-25E1070Fine Grade/Seed/Restore Site2030-Oct-2526-Nov-25Yard PipingYard Piping34215-May-2417-Sep-25YP1000Excavate/Install 48" Interceptor Line3015-May-2426-Jun-24YP1010Re-Route 16" Water Main1527-Jun-2418-Jul-24YP1070Demo/Abandon Existing Sanitary Lines for Basin2527-Jun-2401-Aug-24YP1040Install Structure 61503-Dec-2423-Dec-24YP1050Install Structure 71524-Dec-2415-Jan-25YP1020Excavate/Install 96" RCP to Structure 61016-Jun-2527-Jun-25YP1030Excavate/Install 96" RCP to Overflow Structure1501-Aug-2521-Aug-25YP1060Install 4" Dewatering FM to Diversion Structure511-Sep-2517-Sep-25EQ BasinEQ Basin10002-Aug-2423-Dec-24EQ1000Excavate/Place Tank Foundations4002-Aug-2427-Sep-24EQ1010Install Tilt Up Precast Wall Panels1530-Sep-2418-Oct-24EQ1020Grout Topping Slab1521-Oct-2408-Nov-24EQ1040Water Test Tank511-Nov-2415-Nov-24EQ1030Install Basin Flushing Equipment1518-Nov-2409-Dec-24EQ1060Backfill Structure1018-Nov-2402-Dec-24EQ1050Install Electrical/Water Connections & Piping1010-Dec-2423-Dec-24Control BuildingControl Building12530-Sep-2426-Mar-25CB1000Excavate/Place Concrete Fndn1030-Sep-2411-Oct-24CB1010Install CMU Block Fndn514-Oct-2418-Oct-24CB1130Backfill Structure321-Oct-2423-Oct-24CB1020FRP Exterior Conc Pads/SOG1024-Oct-2406-Nov-24CB1030Install CMU Bearing Walls1007-Nov-2420-Nov-24CB1040Set/Grout Pre-Cast Planks721-Nov-2402-Dec-24CB1050Top Out Masonry Walls503-Dec-2409-Dec-24CB1060Install Exterior Brick Veneer1010-Dec-2423-Dec-24CB1070Install Elastomeric Roofing System/Downspouts1024-Dec-2408-Jan-25CB1080Install Exterior Doors/Hardware524-Dec-2431-Dec-24CB1090Interior Coatings509-Jan-2515-Jan-25CB1100Install Interior Electrical Gear/Panels/Controls2013-Feb-2512-Mar-25CB1110Install Accessories513-Mar-2519-Mar-25CB1120Install Generator/ATS1013-Mar-2526-Mar-25Influent Lift StationInfluent Lift Station14019-Jul-2405-Feb-25LS1000Excavate Wet Well Structure519-Jul-2425-Jul-24LS1010FRP Concrete Well Well Structure3526-Jul-2413-Sep-24LS1020Backfill Wet Well Structure516-Sep-2420-Sep-24LS1030FRP Concrete Flow Distribution Box2523-Sep-2425-Oct-24LS1060Install Below Slab Flow Distribution Piping507-Oct-2411-Oct-24LS1040Water Test Structure528-Oct-2401-Nov-24LS1070Install Basin Fillets1004-Nov-2415-Nov-24LS1050Install Pumps and Piping1518-Nov-2409-Dec-24LS1080Install Gates and Actuators1010-Dec-2423-Dec-24LS1120Coat New Piping1010-Dec-2423-Dec-24LS1090Install Handrail and Grating1024-Dec-2408-Jan-25LS1100Electrical Conduit/Wire/Connections2009-Jan-2505-Feb-25LS1110Install Controls and Flow Instrumentation1009-Jan-2522-Jan-25Diversion StructureDiversion Structure15928-Mar-2510-Nov-25DS1000Excavate Diversion Structure1528-Mar-2517-Apr-25DS1010Cut/Remove Portion of Existing 96" CSO Line518-Apr-2524-Apr-25DS1020FRP Lower Foundation/Slab1025-Apr-2508-May-25DS1030FRP Structure Walls2509-May-2513-Jun-25DS1120Water Test Structure516-Jun-2520-Jun-25DS1130Backfill Structure322-Aug-2526-Aug-25DS1040FRP Top Slab1027-Aug-2510-Sep-25DS1050Grout Basin Fillets811-Sep-2522-Sep-25DS1060Install Static Bar Screens523-Sep-2529-Sep-25DS1070Install Mech Bar Screens523-Sep-2529-Sep-25DS1080Install Slide and Weir Gates1030-Sep-2513-Oct-25DS1090Install Grating and Supports1014-Oct-2527-Oct-25DS1100Electrical Conduit/Wire Connections1028-Oct-2510-Nov-25DS1110Install Flow Control Instrumentation728-Oct-2505-Nov-25Overflow StructureOverflow Structure6416-Jun-2515-Sep-25OS1000Excavate for Structure816-Jun-2525-Jun-25OS1010FRP Lower Concrete Slab1026-Jun-2510-Jul-25OS1020FRP Concrete Walls1511-Jul-2531-Jul-2512001230122011200122011201123012201120112301220112001230122011200122012201120012201120012001230122011200122012201123012201120012301220112001200122011201123012201120012301July 2023ASONDJFMApril 2024May 2024JJuly 2024ASONDJFMApril 2025May 2025JJuly 2025ASONDJFMApril 2026May 2026JJuly 2026ASExcavate/Grade Retention PondExcavate/Prep/Place Concrete PavementRough Grade SiteExcavate/Prep/Place Asphalt PathFine Grade/Seed/Restore Site17-Sep-25, Yard PipingExcavate/Install 48" Interceptor LineRe-Route 16" Water MainDemo/Abandon Existing Sanitary Lines for BasinInstall Structure 6Install Structure 7Excavate/Install 96" RCP to Structure 6Excavate/Install 96" RCP to Overflow StructureInstall 4" Dewatering FM to Diversion Structure23-Dec-24, EQ BasinExcavate/Place Tank FoundationsInstall Tilt Up Precast Wall PanelsGrout Topping SlabWater Test TankInstall Basin Flushing EquipmentBackfill StructureInstall Electrical/Water Connections & Piping26-Mar-25, Control BuildingExcavate/Place Concrete FndnInstall CMU Block FndnBackfill StructureFRP Exterior Conc Pads/SOGInstall CMU Bearing WallsSet/Grout Pre-Cast PlanksTop Out Masonry WallsInstall Exterior Brick VeneerInstall Elastomeric Roofing System/DownspoutsInstall Exterior Doors/HardwareInterior CoatingsInstall Interior Electrical Gear/Panels/ControlsInstall AccessoriesInstall Generator/ATS05-Feb-25, Influent Lift StationExcavate Wet Well StructureFRP Concrete Well Well StructureBackfill Wet Well StructureFRP Concrete Flow Distribution BoxInstall Below Slab Flow Distribution PipingWater Test StructureInstall Basin FilletsInstall Pumps and PipingInstall Gates and ActuatorsCoat New PipingInstall Handrail and GratingElectrical Conduit/Wire/ConnectionsInstall Controls and Flow Instrumentation10-Nov-25, Diversion StructureExcavate Diversion StructureCut/Remove Portion of Existing 96" CSO LineFRP Lower Foundation/SlabFRP Structure WallsWater Test StructureBackfill StructureFRP Top SlabGrout Basin FilletsInstall Static Bar ScreensInstall Mech Bar ScreensInstall Slide and Weir GatesInstall Grating and SupportsElectrical Conduit/Wire ConnectionsInstall Flow Control Instrumentation15-Sep-25, Overflow StructureExcavate for StructureFRP Lower Concrete SlabFRP Concrete WallsSouth Bend WWTP EQ Basin Clarifier ProjectHID23058Primary Baseline View10-Jul-23 13:45Actual WorkRemaining WorkCritical Remaining WorkMilestoneSummaryPage 3 of 5TASK filters: In Progress, Not Started.© Oracle Corporation