Laserfiche WebLink
TODD LEMEN <br />Regional Vice President <br />EXPERIENCE <br />Evansville Water and Sewer Utility, West WWTP Storage Basin, <br />Evansville, Indiana. Guaranteed Savings Contract. <br />Provider for construction of a 6MG concrete CSO storage tank with <br />approx. dimensions of 290'x270'x35'. Work included construction <br />of a new screening facility with 4-33mgd fine screens, a new 48" <br />high flow influent connection, and a passive flow control weir to the <br />storage basin. Balance of work included relocation of plant entrance, <br />site work, electrical and I&C. Contract Amount: $29,165,968 <br />City of Warsaw, Wastewater Treatment Plant Expansion, Warsaw, <br />Indiana <br />Work included comprehensive tasks to increase the capacity of the <br />WWTP including new grit removal tanks, new primary clarifiers and <br />control buildings, new anaerobic selector tanks, new final clarifier and <br />sludge pump building, new RAS and WAS pumps, new UV disinfection <br />system, new sludge dewatering equipment. Work also included <br />modifying existing oxidation ditches, modifying existing final clarifiers, <br />modifying the existing aerobic digesters and sludge holding tanks, <br />relation of energy power generation as well as associated electrical, <br />&C, HVAC and site work. Contract Amount: $25,710,750 <br />City of Fort Wayne, Water Pollution Control Plant, Fort Wayne, <br />Indiana. Guaranteed Savings Contract. <br />This upgrade touched the primary, secondary and sludge processing <br />systems. Work included improvements to nine clarifiers, including <br />the secondary clarifier hydraulics, concrete repair of aeration tanks, <br />cover replacement on 3 digesters, new sludge pumping and methane <br />compression systems, and addition of combined -heat -and -power <br />system. Contract Amount: $27,000,000 <br />SOUTHBEND, INDIANA GSC 13 <br />