My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:09:44 AM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TODD LEMEN <br />Regional Vice President <br />EXPERIENCE <br />Evansville Water and Sewer Utility, West WWTP Storage Basin, <br />Evansville, Indiana. Guaranteed Savings Contract. <br />Provider for construction of a 6MG concrete CSO storage tank with <br />approx. dimensions of 290'x270'x35'. Work included construction <br />of a new screening facility with 4-33mgd fine screens, a new 48" <br />high flow influent connection, and a passive flow control weir to the <br />storage basin. Balance of work included relocation of plant entrance, <br />site work, electrical and I&C. Contract Amount: $29,165,968 <br />City of Warsaw, Wastewater Treatment Plant Expansion, Warsaw, <br />Indiana <br />Work included comprehensive tasks to increase the capacity of the <br />WWTP including new grit removal tanks, new primary clarifiers and <br />control buildings, new anaerobic selector tanks, new final clarifier and <br />sludge pump building, new RAS and WAS pumps, new UV disinfection <br />system, new sludge dewatering equipment. Work also included <br />modifying existing oxidation ditches, modifying existing final clarifiers, <br />modifying the existing aerobic digesters and sludge holding tanks, <br />relation of energy power generation as well as associated electrical, <br />&C, HVAC and site work. Contract Amount: $25,710,750 <br />City of Fort Wayne, Water Pollution Control Plant, Fort Wayne, <br />Indiana. Guaranteed Savings Contract. <br />This upgrade touched the primary, secondary and sludge processing <br />systems. Work included improvements to nine clarifiers, including <br />the secondary clarifier hydraulics, concrete repair of aeration tanks, <br />cover replacement on 3 digesters, new sludge pumping and methane <br />compression systems, and addition of combined -heat -and -power <br />system. Contract Amount: $27,000,000 <br />SOUTHBEND, INDIANA GSC 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.