Laserfiche WebLink
14SOUTHBEND, INDIANA GSC <br />Associates <br />Architectural Technology <br />Purdue University <br />West Lafayette, Indiana <br />EXPERTISE <br />Joe Lambdin brings almost thirty years of experience in heavy civil <br />construction to the role of Area Manager for Kokosing’s Indiana <br />operations. He is responsible for the staffing, organization and execution <br />of the work which is valued at over $60M annually. He draws on his <br />firsthand experience as a Project Manager to position projects for success, <br />understanding the schedule, scope, labor and equipment requirements of <br />large scale, heavy civil projects. <br />JOE LAMBDIN <br />Area Manager <br />EDUCATION <br />TRAINING <br />OSHA 30-hour Occupational <br />Safety & Health Training <br />OSHA 10-hour Occupational <br />Safety & Health Training <br />Red Tag <br />Basic Plus <br />Industrial Worker <br />Confined Space Entry <br />Scaffold <br />Rigging <br />EXPERIENCE <br />Evansville Water and Sewer Utility, East WWTP Expansion, Evansville, <br />Indiana <br />Project expanded the capacity of the existing plant to meet CSO LTCP <br />requirements. Working addressed expansion of biological treatment <br />processes including installation of a Biological Aerated Filter (BAF), <br />expanded UV disinfection, expanding the solids handing systems, <br />electrical, and I&C systems. Work also included expanding the <br />hydraulic capacity by replacing select piping and adjusting clarifier <br />effluent weirs. Contract Amount: $48,390,809 <br />City of Plymouth, Wastewater Treatment Plant Expansion, Plymouth, Indiana. Guaranteed Savings Contract. <br />Headworks structure improvements, existing Bio-Roughing Tower <br />renovations, addition of a new Aeration Tank, addition of a new <br />Secondary Clarifier, recoating of existing Primary and Secondary <br />Clarifiers, new standby generator, data control systems improvements, <br />installation of a new centrifuge sludge dewatering building/system <br />and recoating of the existing Secondary Digester Cover. Contract <br />Amount: $10,800,000 <br />City of Bluffton, Wastewater Treatment Plant Improvements, Bluffton, Indiana. Guaranteed Savings Contract. <br />Removal and replacement of the existing 65-foot diameter primary digester cover and 55-foot diameter secondary digester cover of Plant #2; two new digester mixers for Plant #2 primary digester; insulation of Plant #1 primary digester; construction of a new headworks facility including screening and grit removal; and modifications to Plants #1 and #2 pump stations. Contract Amount: $4,800,000