STEVE EHRET <br />Lead Estimator <br />EXPERIENCE <br />Delaware Wastewater Treatment Plant, Delaware, Ohio <br />Design -Build project that increased the capacity of this plant from 5.5 <br />MGD to 10 MGD. At the time of this project, it was the largest Design - <br />Build municipal WWTP job ever awarded in the state of Ohio. The <br />scope of the project included 4300 LF of large diameter Hobas pipe; <br />15,300 LF of DIP yard piping; 25,000 CY of excavated dirt/landfill/ <br />stone material; 11,000 CY of concrete placed and $5M+ worth of <br />process equipment/piping installed. Contract Amount: $25,000,000 <br />Water Works Improvements Phase 1, Decatur, Indiana. Guaranteed <br />Savings Contract <br />This multi -phased project improved water production for the City <br />of Decatur, Indiana, which was facing issues from high chloride <br />content in the ground water and a fall off in production from some <br />wells. Phase 1 constructed a new East Side Water Treatment Plant <br />using a conventional water softening process. This consisted of <br />catalytic softeners, recarbonation tanks and pressure filters. This <br />was a greenfield construction project, requiring clearing of farm fields <br />and thickly wooded areas to create the plant site. Contract Amount: <br />$7,250,000 <br />Struthers Division WTP, Struthers, Ohio <br />Design -Build expansion of a surface water, lime softening Water <br />Treatment Plant for the Struthers division of our Private water client. <br />This project consisted of designing and constructing a new electrical <br />building, chemical building, a new carbonic acid contact tank and CO2 <br />system, three new 37' solids contact units and splitter box. A major <br />electrical and SCADA upgrade is also part of the project. <br />SOUTHBEND, INDIANA GSC 12 <br />