My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:59 PM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
12SOUTHBEND, INDIANA GSC <br />EXPERTISE <br />Over the last 29 years, Steve Ehret has been involved in many types of projects, <br />from manufacturing facilities to wastewater treatment plants. After 16 years <br />as a project manager, Steve is now a Lead Estimator based in our Westerville <br />office. His years as Project Manager were instrumental in providing detailed <br />and accurate bid/proposal estimates, project engineering and contract <br />administration. He works closely with clients to shape estimating efforts to ensure <br />activities are in alignment with project goals. <br />STEVE EHRET <br />Lead Estimator <br />EDUCATION <br />Bachelor of Science <br />Civil Engineering <br />University of Akron <br />Akron, Ohio <br />TRAINING <br />OSHA 30-hour Occupational <br />Safety & Health Training <br />First Aid/CPR/AED <br />Confined Space Training <br />Steel Erection <br />Scaffold <br />Trench Safety <br />EXPERIENCE <br />Delaware Wastewater Treatment Plant, Delaware, Ohio <br />Design-Build project that increased the capacity of this plant from 5.5 MGD to 10 MGD. At the time of this project, it was the largest Design-Build municipal WWTP job ever awarded in the state of Ohio. The scope of the project included 4300 LF of large diameter Hobas pipe; 15,300 LF of DIP yard piping; 25,000 CY of excavated dirt/landfill/stone material; 11,000 CY of concrete placed and $5M+ worth of process equipment/piping installed. Contract Amount: $25,000,000 <br />Water Works Improvements Phase 1, Decatur, Indiana. Guaranteed <br />Savings Contract <br />This multi-phased project improved water production for the City of Decatur, Indiana, which was facing issues from high chloride content in the ground water and a fall off in production from some wells. Phase 1 constructed a new East Side Water Treatment Plant using a conventional water softening process. This consisted of catalytic softeners, recarbonation tanks and pressure filters. This was a greenfield construction project, requiring clearing of farm fields and thickly wooded areas to create the plant site. Contract Amount: $7,250,000 <br />Struthers Division WTP, Struthers, Ohio <br />Design-Build expansion of a surface water, lime softening Water <br />Treatment Plant for the Struthers division of our Private water client. <br />This project consisted of designing and constructing a new electrical <br />building, chemical building, a new carbonic acid contact tank and CO2 <br />system, three new 37’ solids contact units and splitter box. A major <br />electrical and SCADA upgrade is also part of the project.
The URL can be used to link to this page
Your browser does not support the video tag.