My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOWEN PROJECT IMPLEMENTATION <br />To increase your confidence in our competitive advantage as a self -performing Provider as well as <br />our long standing NW Indiana presence, below is a list of our past and current traditional projects <br />with the City of South Bend: <br />1998 - $2.4M Pinhook Renovations (WTP) <br />1999 - $5.5M Secondary Clarifier Improvements (WWTP) <br />2000 - $2.1 M Blower Replacement/Generator Improvements (WWTP) <br />2010 - $2.2M Blowers 1A & 1 B Rehab (WWTP) <br />2019 - $1.8M Olive St. Filter Improvements (WTP) <br />2020 - $4.27M Final Clarifier Improvements (WWTP) <br />2021 - $1.78 Pinhook GSC Improvements (WTP) <br />2022 - $3.58M North WTP Improvements <br />4d) Other Subcontractor's Involvement: Identify which portions of the <br />project the Provider intends to implement with subcontractors and how the <br />subcontractors will interact with the Team. <br />There are some items that Bowen does not perform with our own work force. Electrical, masonry, <br />and HVAC are examples of what Bowen would subcontract on this project, which are a very low <br />percentage of the overall project cost. Bowen will still be the single point of contact and accountable <br />for all subcontracted work. We manage our subcontractors as if they were our craft. We hold them to <br />the same safety standards and the same schedule standards. Below is one example of a key, local <br />partner we would consider to ensure a successful project outcome. <br />► Sweney Electric (Multiple Northern Indiana GSC Experience) <br />South Bend will have input and the final decision on any subcontractors and vendors used on <br />the team. <br />
The URL can be used to link to this page
Your browser does not support the video tag.