My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
%741eowEN PROJECT IMPLEMENTATION <br />Seven Elements of Planning <br />Excellent project coordination does not happen by accident. It requires intensive planning prior to project <br />execution. Bowen uses the "Seven Elements" method of pre -planning to ensure all aspects of the project <br />are considered, communicated, and planned. <br />We address each of these areas individually since they vary widely from one project to the next. By <br />carefully analyzing our resource allocation, the information flows into our next pre -construction process: <br />storyboarding. Storyboarding is the detailed division of tasks by function and requirements to complete the <br />project. By combining the seven elements of planning and storyboarding, Bowen is able to properly plan <br />projects, staff them appropriately and thoroughly address critical path items. <br />4c) General Construction Subcontractor: Identify the General Contractor Team <br />Member who will perform the general construction and the approximate <br />percentage of the contract value that such effort might represent. Explain <br />the Provider's ability to work with such General Construction Team Member <br />including experience working together on past projects. <br />Bowen is a Provider of Indiana Guaranteed Savings Contracts and also a General Contractor who <br />would perform 100% of the general construction for South Bend. We are also a self -performing General <br />Contractor. Bowen has been a self -performing General Contractor in the water and wastewater <br />improvements industry for 55 years. This is truly the key to our success. We can provide more value <br />in the design phase due to having hands on craft at the table during value engineering meetings. This <br />lowers the cost of your project by not having to pay multiple layers of mark-up. As a self -performing <br />General Contractor we will provide: <br />► A single point of contact for all issues and communications <br />► Cost reductions eliminating a layer of mark-ups <br />► Will provide knowledge of your facility with our experienced staff <br />► Tailor a final solution that meets or exceeds your staff's expectations <br />SAFETY INFORMATION EQUIPMENT MANPOWER TOOLS WORKSPACE MATERIALS <br />
The URL can be used to link to this page
Your browser does not support the video tag.