Laserfiche WebLink
BOWEN PROJECT IMPLEMENTATION <br />Below is a typical schematic overview of the delivery process with major actions of Bowen shown in red, <br />and the Utility in gold. This process has been used on past Guaranteed Saving Contracts completed by <br />Bowen, but can be modified to fit the needs of the City. <br />Bowen Performance Contracting Team Implementation <br />........................... <br />► <br />Establish timing <br />and design of <br />project meetings <br />► <br />Invoicing <br />► <br />Clean work -site <br />program <br />► <br />Safety program <br />enforcement & <br />postings <br />► <br />Documentation of <br />field tests as <br />required by <br />contract <br />................................. <br />► <br />IDEM Permitting <br />► <br />Sanitary/Water for new <br />services <br />► <br />Gas or electricity <br />services required <br />beyond existing <br />► <br />Review of state and <br />local permitting and <br />submittal requirements <br />► <br />Review of any local <br />zoning issues for new <br />construction <br />► <br />On -site fuel <br />storage permitting / <br />requirements <br />► <br />Identification of <br />construction v. <br />operating permit <br />requirements <br />► <br />Identify final lead times <br />for permitting <br />processes and <br />constraints before <br />permits are issued <br />► <br />Mobilize consultants <br />► <br />Installation verification <br />► <br />Punch Lists <br />► <br />Conduct & Document <br />field tests as required <br />by contract <br />► <br />Collect post - <br />construction data <br />► <br />................................: <br />Customer training <br />► <br />Final billing & invoicing <br />► <br />Manuals/Submittals <br />► <br />Transfer warranties <br />► <br />As -built drawings <br />► <br />Certificate of <br />completion <br />