My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
......................................... <br />BOWEN HAS BEEN <br />BOWEN PROJECT IMPLEMENTATION :SQP LEANPLEMENTING PROCESSES ON ITS <br />PROJECTS FOR 25+YEARS <br />Bowen SQP Lean Construction Process <br />Bowen SQP Lean Construction execution process is Bowen's construction execution approach. Bowen <br />SQP is construction's equivalent of Toyota's "lean manufacturing" that Bowen has been using on all of <br />our projects for over 25 years. Bowen SQP Lean Construction allows for continuous improvement of our <br />projects along with the delivery process we use for implementation. This strategy is part of the Bowen <br />culture and utilized on all Bowen projects. Genuine concern for others, and the safety of everyone <br />connected to our projects is, and will always be, a core value for Bowen. Bowen has maintained a <br />TRIR and EMR of <1.0 for over a decade running. Bowen was recognized for our safety program while <br />receiving one of our most recent Top Notch Indiana Contractor of the Year awards. <br />Imoo, <br />n BOWEN SAFETY, QUALITY, PRODUCTION (SQP): <br />IC <br />LEAN CONSTRUCTION METHODOLOGY TO FACILITATE PLANNING, <br />®� ELIMINATE WASTE, PROMOTE COMMUNICATION, DRIVE ACCOUNTABILITY, <br />AND CREATE CONTINUOUS IMPROVEMENT <br />....................................... <br />BOWEN WILL WORK WITH <br />SOUTH BEND'S DESIRED <br />SYSTEMS. TYPICALLY <br />WE FACILITATE <br />CONSTRUCTION AND <br />COMMUNICATION WITH THE <br />FOLLOWING TOOLS <br />ORACLE' <br />VIEWPOINT <br />CONS <br />I AUTOCAD <br />REVIT <br />Q PlanGrid <br />IUMI <br />
The URL can be used to link to this page
Your browser does not support the video tag.