My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:20 PM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Northern-Based Project Team <br />Proven Experience at Your Facilities & On-time Well Delivery <br />History of Collaboration with South Bend & your Engineers <br />#1 Water/Wastewater GSC Provider in Indiana <br /> In addition, provide references of projects completed with a similar scope of work <br />to the described WWTP/CSO 045 EQ Basin and Clarifier Upgrade Projects. Include <br />the location, scope of work, and personnel responsible. <br />REFERENCES <br />• CEG River Road WTP Phase II Clearwell Expansion (2020) <br />• City of Lafayette Greenbush CSO Storage Tank (2019) <br />• Indianapolis Airport Authority Stormwater Deicing (2019) <br />• Muncie Sanitary District WPCF Upgrades (2019) <br />• Goshen, IN CSO Detention (2012) <br />• Washington, IN CSO (2012) <br />• CEG White River Station Reservoir (2001) <br />• CEG Belmont AWT Plant Upgrades (2006) <br />• CEG Southport AWT Plant Upgrades (2006) <br />• CEG White River North Groundwater Treatment Plant (2006) <br />• CEG South Well Field Reservoir (2005) <br />• CEG White River Station Reservoir (2001) <br />Recent Tank Projects <br /> Tank Experience <br />• TN American Water Citico Station Sedimentation Basin <br />2014-2016 <br />• Aqua Marion, OH WTP Sedimentation Basin <br />2013-2014 <br />• Veolia Water South Well Field Sludge Thickening <br />2009 <br />• Indianapolis Water Company White River Residual <br />Handling, 2003 <br />• City of Lebanon Dutchland Storage Tank, 2022 <br />• City of Delphi 2 Pre-Stressed Concrete Tanks, 2019-2020 <br />• Coordinate closely with engineer to layout construction joints in walls to optimize production <br />and quality <br />• Try to get slab pours as large as possible and avoid checker-boarding pours <br />• Groundwater control is key. For dewatering activities, arrange for temporary power for pumps <br />in lieu of generators when possible. <br />• Work early with concrete supplier and design engineer to ensure proper mix design and <br />availability in the market. Have supplier run a concrete curing curve to understand cure times. <br />SQP Insights: Continuous Improvement and Lessons Learned <br />Post-TensionedCast-in-Place <br />Bowen has built tanks since: 1967 Pre-Load
The URL can be used to link to this page
Your browser does not support the video tag.