My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:20 PM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Northern-Based Project Team <br />Proven Experience at Your Facilities & On-time Well Delivery <br />History of Collaboration with South Bend & your Engineers <br />#1 Water/Wastewater GSC Provider in Indiana <br />REFERENCES <br />www.bowenengineering.com - 317.842.2616 <br />Indianapolis, IN - Columbus, OH - Evansville, IN <br />Baltimore, MD - Nitro, WV <br />Tank Experience <br />Muncie Sanitary District WPCF / Muncie, IN Project Schedule: 2016 - 2019•Settling Tank: 1.9 MG•Wet Weather Storage Basin: 17 MG•370,000 SF of EPDM Liner for basin•100,000 CY excavation; 6,700 CY concrete•700 TONS rebar; 90,000 SF formwork <br />City of Lafayette CSO Storage Tank / Lafayette, IN <br />Project Schedule: 2017 - 2019•4.2 MG underground CSO concrete tank•41,646 CY excavation; 9,978 CY concrete•816 - 50, 45, and 30 FT piles•990 TONS rebar; 108,788 SF formwork•719 LF of 110” piping•(4) Grande Flushing Gates, (1) Tipping bucket <br />for flush water, (4) sets of fine screens, (2) Flygt <br />Dewatering Pumps <br />TN American Water Citico Station WTP / Chattanooga, TN <br />Project Schedule: 2015 - 2016•Sedimentation basin to increase water treatment <br />capacity•Multiple tie-ins•Reduced construction joints in re-sequenced pours <br />to expedite schedule•3,392 CY of concrete; 110 Tons of rebar <br />Aqua Marion WTP / Marion, OH <br />Project Schedule: 2016•Sedimentation basin constructed and in service <br />within 5 months•Zero impact to daily plant’s ability to service <br />customers•2,500 CY of concrete•700 Tons of rebar <br />Indianapolis Airport Authority Stormwater Deicing / Indianapolis, IN <br />Project Schedule: 2018-2019•10 MG concrete tank•Post-tensioned roof deck•Largest pour: 4,000 CY of concrete
The URL can be used to link to this page
Your browser does not support the video tag.