My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:20 PM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#1 Provider of Indiana Water/Wastewater GSCs <br />References <br /> 2 <br />“...These projects were completed on schedule and under budget. Some of these schedules have been very demanding and Bowen has always risen to the occasion. The City appreciates Bowen’s team relationship as we have been able to creatively Value Engineer project savings and use the funds to do additional much-needed work. Bowen operational staff has been extremely responsive to the needs of the City and have even helped out in emergency situations.” “In summary, the City of Lafayette is very pleased with the work performed by Bowen Engineering and the team environment of the Guaranteed Savings Contract process. Bowen should be proud of its staff for the excellent efforts in always getting the job done.” <br />“I could go on in detail about the positive as-pects of this contracting process, your firm and the successes within the City projects. We completed the wastewater plant project 6 months earlier than comparable public bidding, obtained approval to use an SRF loan, had no claims or accidents, came in under budget and were able to advance some portions of future phases using project savings. Each of these topics has a story line of its own. Suffice it to say that I hope the City of Plainfield can utilize Bowen Engineering Corporation and the guar-anteed savings method of project delivery on many future projects.” <br /> “Bowen Engineering has been a valued partner in the GSC process and has delivered on their commitments as allowed by the GSC rule. Our VCU selection committee recommended Bowen as the GSC provider due to their overall presentation, experience and successful track record within the GSC process.” <br />Brad Talley <br />WWTP Superintendent <br />765.807.1800 <br />Tim Belcher <br />City Engineer <br />317.839.2561 <br />19 <br />22 <br />GSC Contracts <br />GSC Contracts <br />6 GSC Contracts <br />Dave M. Wagner <br />Millennium Environmental LLC <br />317.876.6233 <br />5 GSC Contracts Steve C. Poulos <br />Valparaiso City Utilities Director <br />219.462.6174 <br /> “A positive working relationship was started several years ago when Bowen was selected by Butler to complete the replacement of their water treatment plant, utilizing the guaranteed savings program procurement method. That project was completed on-time and on-budget and the new water plant has functioned above expectations since Bowen completed the job.”
The URL can be used to link to this page
Your browser does not support the video tag.