My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 2:05:00 PM
Creation date
6/13/2023 2:04:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br /> <br />Task 3 – 50% Detailed Design Services <br /> <br />3.1 50% Design & Drawings: Perform process, electrical, I&C, structural and site / civil design required <br />for proposed infrastructure. The Drawings will generally include (estimated): <br /> <br /> Sheets <br />Title Sheet 1 <br />General Location Map and Drawing Sheet Index 1 <br />Abbreviations, Legends and General Notes 1 <br />Temporary Benchmarks and Control Points Location Map 1 <br />Site and Piping Demolition / Site and Piping / Grading Design 3 <br />CSO 022 Structure Modification / New CSO 022 Design 3 <br />Erosion Control, Site Access, and Construction Limits 2 <br />Miscellaneous Details 6 <br />Electrical, Instrumentation & Control Design 4 <br />Structural Design 4 <br />TOTAL 26 <br /> <br />3.2 50% Technical Specifications: Prepare and submit 50% technical specifications. <br /> <br />3.3 50% Construction Estimate & Quantities: Calculate quantities and prepare construction cost <br />estimate. <br /> <br />3.4 50% QA/QC: Perform independent QA/QC review of 50% design deliverables. <br /> <br />3.5 50% Submittal: Furnish three (3) complete hard copies and an electronic copy of the 50% Preliminary <br />Design Submittal for review and approval. <br /> <br />50% Submittal: <br />· 50% Preliminary Design Drawings (Full Size and Half-Size) <br />· 50% Technical Specifications <br />· 50% Construction Estimate & Quantities <br /> <br />Task 4 – 95% Detailed Design Services <br /> <br />4.1 95% Design & Drawings: Complete process, electrical, I&C, structural and site / civil design required <br />for proposed infrastructure. <br /> <br />4.2 95% Technical Specifications and Contract Documents: Prepare and submit 95% technical <br />specifications and contract documents. <br /> <br />4.3 95% Construction Estimate & Quantities: Calculate quantities and prepare construction cost <br />estimate. <br /> <br />4.4 95% QA/QC: Perform independent QA/QC review of 95% design deliverables. <br /> <br />4.5 95% Submittal: Furnish three (3) complete hard copies and an electronic copy of the 95% Preliminary <br />Design Submittal for review and approval. <br /> <br />95% Submittal: <br />· 95% Preliminary Design Drawings (Full Size and Half-Size) <br />· 95% Technical Specifications <br />· 95% Construction Estimate & Quantities <br /> <br />Task 5 – Final Detailed Design Services <br /> <br />5.1 Final Drawings & Contract Documents: Update the drawings and contract documents based on the <br />95% Submittal Review Workshop. <br />
The URL can be used to link to this page
Your browser does not support the video tag.