Laserfiche WebLink
2 <br /> <br />Task 3 – 50% Detailed Design Services <br /> <br />3.1 50% Design & Drawings: Perform process, electrical, I&C, structural and site / civil design required <br />for proposed infrastructure. The Drawings will generally include (estimated): <br /> <br /> Sheets <br />Title Sheet 1 <br />General Location Map and Drawing Sheet Index 1 <br />Abbreviations, Legends and General Notes 1 <br />Temporary Benchmarks and Control Points Location Map 1 <br />Site and Piping Demolition / Site and Piping / Grading Design 3 <br />CSO 022 Structure Modification / New CSO 022 Design 3 <br />Erosion Control, Site Access, and Construction Limits 2 <br />Miscellaneous Details 6 <br />Electrical, Instrumentation & Control Design 4 <br />Structural Design 4 <br />TOTAL 26 <br /> <br />3.2 50% Technical Specifications: Prepare and submit 50% technical specifications. <br /> <br />3.3 50% Construction Estimate & Quantities: Calculate quantities and prepare construction cost <br />estimate. <br /> <br />3.4 50% QA/QC: Perform independent QA/QC review of 50% design deliverables. <br /> <br />3.5 50% Submittal: Furnish three (3) complete hard copies and an electronic copy of the 50% Preliminary <br />Design Submittal for review and approval. <br /> <br />50% Submittal: <br />· 50% Preliminary Design Drawings (Full Size and Half-Size) <br />· 50% Technical Specifications <br />· 50% Construction Estimate & Quantities <br /> <br />Task 4 – 95% Detailed Design Services <br /> <br />4.1 95% Design & Drawings: Complete process, electrical, I&C, structural and site / civil design required <br />for proposed infrastructure. <br /> <br />4.2 95% Technical Specifications and Contract Documents: Prepare and submit 95% technical <br />specifications and contract documents. <br /> <br />4.3 95% Construction Estimate & Quantities: Calculate quantities and prepare construction cost <br />estimate. <br /> <br />4.4 95% QA/QC: Perform independent QA/QC review of 95% design deliverables. <br /> <br />4.5 95% Submittal: Furnish three (3) complete hard copies and an electronic copy of the 95% Preliminary <br />Design Submittal for review and approval. <br /> <br />95% Submittal: <br />· 95% Preliminary Design Drawings (Full Size and Half-Size) <br />· 95% Technical Specifications <br />· 95% Construction Estimate & Quantities <br /> <br />Task 5 – Final Detailed Design Services <br /> <br />5.1 Final Drawings & Contract Documents: Update the drawings and contract documents based on the <br />95% Submittal Review Workshop. <br />