Laserfiche WebLink
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 15 <br />3. The cost of compacted aggregate under bike ramp, bike ramp, sod and <br />topsoil, as needed at back of sidewalk, shall be included in the cost of <br />Concrete Sidewalk. <br /> <br />XXXVI. CURBING <br /> <br />A. 2022 INDOT Standard Specification: 605 <br /> <br />B. Additions: None. <br /> <br />XXXVII. REINFORCING BARS <br /> <br />A. 2022 INDOT Standard Specification: 703 <br /> <br />B. Additions: None. <br /> <br />XXXVIII. REINFORCED CONCRETE BRIDGE APPROACHES <br /> <br />A. 2022 INDOT Standard Specification: 609 <br /> <br />B. Additions: <br /> <br />2. The cost of Type 1A joint in west RCBA is included in the cost of the Reinforced <br />Concrete Bridge Approach pay item. <br /> <br />3. Contractor see Section 703.04, upon damage to epoxy coated bars. <br /> <br />XXXIX. BRIDGE EXPANSION JOINTS <br /> <br />A. 2022 INDOT Standard Specification: 724 <br /> <br />B. Additions: <br /> <br />1. This work shall consist of removal of the existing expansion joint, if <br />applicable, and furnishing and placing the new pre-compressed foam joint as <br />shown on the plans and in accordance with 105.03. <br /> <br />XL. CLEAN EXISTING INLET <br /> <br />A. 2022 INDOT Standard Specification: 720 <br /> <br />B. Additions: <br /> <br />1. This work shall consist of cleaning all existing bridge deck drains within the <br />limits of the project of any accumulations of silt, debris, or foreign matter in <br />accordance with 105.03 and as shown on the plans. <br /> <br />2. All existing drains within the Bridge shall be cleaned of any accumulations <br />of silt, debris, or foreign matter of any kind after the construction is <br />substantially complete and as approved by the Engineer. Material removed <br />shall be collected and disposed of in accordance with the applicable <br />requirements of 202.02.