Laserfiche WebLink
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 14 <br /> <br />B. Additions: <br /> <br />1. This work shall include patching top of abutment, wingwalls/retaining walls, <br />and bridge railing as shown on the plans. <br /> <br />XXXII. CONCRETE BRIDGE DECK OVERLAYS <br /> <br />A. 2022 INDOT Standard Specification: 722 <br /> <br />B. Additions: <br /> <br />1. See Schedule of pay items for base bid with Silica Fume Modified and <br />alternate bid with Latex Modified concrete bridge deck overlays. <br /> <br />XXXIII. CONCRETE SURFACE SEALERS <br /> <br />A. 2022 INDOT Standard Specification: 709 <br /> <br />B. Additions: <br /> <br />1. The masonry coating for bridge railing will not be paid for separately and <br />shall be included in the cost of surface seal for bridge railing. <br /> <br />XXXIV. TRANSITION MILLING <br /> <br />A. 2022 INDOT Standard Specifications: 306 <br /> <br />B. Additions: <br /> <br />1. Transition milling will consist of milling the entire width of the road to a 1- <br />1/2" maximum depth and provide a 2% cross slope or as directed by the <br />Engineer. All butt joints shall be straight and vertical. Depth and lengths of <br />butt joints vary by road. <br /> <br />2. Any surface joint necessary to transition to existing pavement shall be at the <br />depth equal to the surface course unless otherwise stated. <br /> <br />XXXV. SIDEWALKS AND BIKE RAMPS <br /> <br />A. 2022 INDOT Standard Specification: 604 <br /> <br />B. Additions: <br /> <br />1. The limits of sidewalk construction will be at the nearest existing joint shown <br />on the plans. <br /> <br />2. Joint material will be required as described in Section 604. Joint material and <br />self-leveling sealant will not be measured separately and shall be considered <br />incidental to construction of concrete sidewalk. <br />