My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Angela Street Bridge_AA 2023-0515
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
Administrative Approvals
>
Angela Street Bridge_AA 2023-0515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 2:05:07 PM
Creation date
5/15/2023 2:05:40 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Angela Street Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 14 <br /> <br />B. Additions: <br /> <br />1. This work shall include patching top of abutment, wingwalls/retaining walls, <br />and bridge railing as shown on the plans. <br /> <br />XXXII. CONCRETE BRIDGE DECK OVERLAYS <br /> <br />A. 2022 INDOT Standard Specification: 722 <br /> <br />B. Additions: <br /> <br />1. See Schedule of pay items for base bid with Silica Fume Modified and <br />alternate bid with Latex Modified concrete bridge deck overlays. <br /> <br />XXXIII. CONCRETE SURFACE SEALERS <br /> <br />A. 2022 INDOT Standard Specification: 709 <br /> <br />B. Additions: <br /> <br />1. The masonry coating for bridge railing will not be paid for separately and <br />shall be included in the cost of surface seal for bridge railing. <br /> <br />XXXIV. TRANSITION MILLING <br /> <br />A. 2022 INDOT Standard Specifications: 306 <br /> <br />B. Additions: <br /> <br />1. Transition milling will consist of milling the entire width of the road to a 1- <br />1/2" maximum depth and provide a 2% cross slope or as directed by the <br />Engineer. All butt joints shall be straight and vertical. Depth and lengths of <br />butt joints vary by road. <br /> <br />2. Any surface joint necessary to transition to existing pavement shall be at the <br />depth equal to the surface course unless otherwise stated. <br /> <br />XXXV. SIDEWALKS AND BIKE RAMPS <br /> <br />A. 2022 INDOT Standard Specification: 604 <br /> <br />B. Additions: <br /> <br />1. The limits of sidewalk construction will be at the nearest existing joint shown <br />on the plans. <br /> <br />2. Joint material will be required as described in Section 604. Joint material and <br />self-leveling sealant will not be measured separately and shall be considered <br />incidental to construction of concrete sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.