Laserfiche WebLink
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 16 <br /> <br />3. Clean Drains will be measured by the number of bridge deck drains cleaned. <br /> <br />4. The cost of all labor, materials, equipment, clean up, and all necessary <br />incidentals shall be included in the cost of the pay item. <br /> <br />XLI. SIGNS <br /> <br />A. 2022 INDOT Standard Specification: 802 <br /> <br />B. Additions: None <br /> <br />XLII. TRAFFIC MARKINGS <br /> <br />A. 2022 INDOT Standard Specification: 808 <br /> <br />B. Additions: <br /> <br />1. This work shall consist of furnishing and installing or removing pavement <br />traffic markings in accordance with the MUTCD, these specifications, and as <br />shown on the plans. <br /> <br />2. Pavement markings will be paid for at the unit price bid for this item, which <br />shall be full compensation for any longitudinal and transverse marking <br />removal, cleaning and preparing the pavement surface, for furnishing and <br />placing the materials, and for all materials, labor, tools, equipment, and <br />incidentals necessary to complete this work.