My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Angela Street Bridge_AA 2023-0515
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
Administrative Approvals
>
Angela Street Bridge_AA 2023-0515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 2:05:07 PM
Creation date
5/15/2023 2:05:40 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Angela Street Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 13 <br />4. The Contractor, on his own forms to the Engineer, will submit an approved <br />job mix formula for the bituminous mixture five (5) days prior to paving. No <br />mixture will be accepted until job-mix formula has been received and <br />approved by the Engineer. <br /> <br />5. Crushed limestone shall be used as the aggregate. <br /> <br />6. Tack Coat shall be applied at the rate prescribed by INDOT Standard <br />Specification Sections 405 and 406, respectively. <br /> <br />XXVIII. PARTIAL DEPTH PATCHING <br /> <br />A. 2022 INDOT Standard Specification: 722.07 <br /> <br />B. Additions: <br /> <br />1. Areas of the bridge deck and RCBA to be patched before overlay will be <br />marked on the surface by the Engineer. The marked pavement shall be <br />removed to the depth shown on the typical section or as directed. <br /> <br />XXIX. PORTLAND CEMENT CONCRETE PAVEMENT, PCCP <br /> <br />A. 2022 INDOT Standard Specification: 502 <br /> <br />B. Additions: None. <br /> <br />XXX. PCCP RESTORATION <br /> <br />A. 2022 INDOT Standard Specification: 507 & 509 <br /> <br />B. Additions: <br /> <br />1. Longitudinal and transverse joints shall be sawed after deck overlay to create <br />a reservoir for the sealant, to be followed by cleaning and sealing. The <br />cleaning and sealing of the joint shall be in accordance with 507.04(a) and as <br />follows. Transverse and longitudinal joints shall be sealed with hot poured <br />joint sealant in accordance with the sealant manufacturer’s recommendations. <br />Joints shall be sealed with joint sealing materials within 1/4 in. below the <br />surface and shall extend beyond the limits of the overlay to any existing <br />sealant that is to remain in place. <br /> <br />2. Sawing equipment shall be self-propelled single or gang-mounted units. The <br />saw shall be capable of maintaining the specified alignment and depth of cut <br />without damaging the overlay. <br /> <br />3. The cost of Type 1A joint in east RCBA is included in the cost of this pay <br />item. <br /> <br />XXXI. PATCHING CONCRETE STRUCTURES <br /> <br />A. 2022 INDOT Standard Specification: 710.03
The URL can be used to link to this page
Your browser does not support the video tag.