My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Angela Street Bridge_AA 2023-0515
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
Administrative Approvals
>
Angela Street Bridge_AA 2023-0515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 2:05:07 PM
Creation date
5/15/2023 2:05:40 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Angela Street Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 10 <br /> <br />2. For payment purpose, the mobilization portion of this item will be limited to <br />seventy-five (75%) percent of the lump sum price, which will be included in <br />the first partial payment estimate. <br /> <br />3. The balance of the lump sum price is considered as demobilization and will <br />be paid for when all work is completed on the job and final clean-up is <br />completed. <br /> <br />XXI. CLEARING RIGHT-OF-WAY <br /> <br />A. 2022 INDOT Standard Specification: 201 and 202 <br /> <br />B. Additions: <br /> <br />1. The lump sum price bid for "Clearing Right-of-Way" shall include payment <br />for "Clearing and Grubbing", and "Removal of Structures and Obstructions", <br />which shall include removal of all brush, trees, other vegetation, and man- <br />made materials required to perform the scope of work, except for those items <br />which are specifically listed in the proposal for separate payment. <br /> <br />2. The removal of RCBA and integral concrete curb will be measured and paid <br />by the square yard price bid for "Pavement Removal". <br /> <br />3. The removal of concrete curb and gutter will be measured and paid by the <br />square yard price bid for "Curb and Gutter, Remove". <br /> <br />4. The removal of trees will be measured and paid per each price bid for "Tree <br />10-inch, Remove". This work shall also include stump removal, backfill with <br />suitable material, topsoil and hydromulch seed for surface restoration. These <br />items will not be paid separately and shall be included in the cost of this pay <br />item. <br /> <br />5. The removal of sidewalk will be measured and paid by the square yard price <br />bid for "Sidewalk Concrete, Remove". <br /> <br />6. Any fencing or man-made obstructions (i.e., guardrail, utility markers, <br />landscape rocks, etc.) which are in place at the start of construction shall be <br />carefully removed. These items shall be restored using recovered serviceable <br />materials. These shall include obstructions within existing right-of-way <br />impacted by the scope of the work. Removal and restoration of fencing and <br />other man-made obstacles within the right-of-way will not be paid for <br />separately and shall be included in the cost of the pay item. Damaged items <br />caused by the Contractor shall be restored or replaced at no additional cost to <br />the Owner. <br /> <br />7. The Contractor shall have all underground utilities field located prior to the <br />start of construction. The Contractor shall protect existing and relocated <br />utilities from damage. Burial of debris on site will not be allowed. Disposal <br />of debris shall be at an off-site location in an approved manner according to <br />all County and State Statutes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.