My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Angela Street Bridge_AA 2023-0515
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
Administrative Approvals
>
Angela Street Bridge_AA 2023-0515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 2:05:07 PM
Creation date
5/15/2023 2:05:40 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Angela Street Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 8 <br />XVI. CONSTRUCTION ENGINEERING <br /> <br />A. 2022 INDOT Standard Specification: 105.08 <br /> <br />B. Additions: <br /> <br />1. The Contractor will provide all work required under this item. <br /> <br />2. The Contractor will be responsible for witnessing the existing vertical grades <br />for bridge deck overlay requirements. <br /> <br />3. Construction Engineering will be paid for at the lump sum price bid for this <br />item and shall not exceed two (2%) percent of the total of all other bid items <br />of the original proposal. <br /> <br />4. The Contractor shall maintain at the site for the Owner, one (1) record copy <br />of all drawings, specifications, Addenda, Change Orders, and other <br />modifications in good order and marked currently to record all changes made <br />during construction. <br /> <br />5. Upon completion and Final Acceptance, As-Built drawings of all work shall <br />be provided to the County Engineer’s Office. These As-Built drawings shall <br />include specifications, addenda, Change Orders, and other modifications to <br />the project. <br /> <br />6. The Contractor shall prepare a Project Schedule to graphically show by bar <br />chart or using other computer software to reflect the order and <br />interdependence of all activities necessary to complete the Work. This <br />schedule shall reflect bridge rigid deck overlay, RCBA and sidewalk <br />replacement, surface sealing, maintenance of traffic setup, testing, surface <br />restoration, other miscellaneous items and final clean up and shall be made <br />available at the Preconstruction Meeting demonstrating how work will be <br />completed. <br /> <br />7. This project schedule shall be maintained and updated by the Contractor. An <br />updated project schedule highlighting changes or deviations shall be <br />submitted at least on a monthly basis. The schedule shall indicate actual <br />progress in percent complete for each activity and provide a written narrative <br />of revisions causing delay with an explanation of corrective actions taken or <br />proposed. <br /> <br />8. The Contractor shall not be able to make additional costs claim for <br />compressed schedule unless the delay is attributed to events or the work of <br />others beyond their control. <br /> <br />XVII. MATERIAL APPROVAL AND SYSTEM TESTING <br /> <br />A. 2022 INDOT Standard Specification: 106 <br /> <br />B. Additions: <br /> <br />1. The Contractor shall be responsible for all normal testing as specified by the <br />most current version of the INDOT Standard Specifications dated 2022 and <br />all supplements thereto.
The URL can be used to link to this page
Your browser does not support the video tag.