My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Angela Street Bridge_AA 2023-0515
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
Administrative Approvals
>
Angela Street Bridge_AA 2023-0515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 2:05:07 PM
Creation date
5/15/2023 2:05:40 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Angela Street Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 5 <br />3. The award of the contract will be made within a maximum time of sixty (60) <br />calendar days from the submittal date. The County reserves the right to hold <br />the bids until the award of the contract. <br /> <br />4. The Engineer shall approve all sub-contractors submitted by the Contractor. <br /> <br />5. Upon award, the Engineer shall submit Contract Documents to the <br />Contractor. Contract Documents include the Contract, Payment and <br />Performance Bonds, and a 3-year Maintenance Bond. <br /> <br />XIII. LIQUIDATED DAMAGES <br /> <br />A. 2022 INDOT Standard Specification: 108 <br /> <br />B. Additions: <br /> <br />1. The time of beginning and the time of completing the work are essential <br />conditions of the Contract. Should the Contractor fail to complete the work <br />within the time stipulated, or within any extensions thereof granted by the <br />Owner, there shall be a deduction in the amount otherwise due the <br />Contractor, not as penalty, but as ascertained and liquidated damages, for <br />each and every day that the Contractor shall be in default after the time <br />stipulated, or as extended, in the amount of $500.00 per day. <br /> <br />2. Any liquidated damages due the Owner shall be deducted from the final <br />payment due the Contractor. Should the amount otherwise due the <br />Contractor be less than the amount of such liquidated damages, the <br />Contractor and his surety shall be liable to the Owner for such deficiency. <br /> <br />3. Lost time shall not be included in the computation of Contract time, and <br />liquidated damages shall not be assessed against the Contractor for that day’s <br />delay when the loss of the day's work is due to an unforeseeable cause <br />beyond the control and without the fault or negligence of the Contractor. <br />Such unforeseeable causes shall include but not necessarily be restricted to <br />the following: <br /> <br />a. Acts of God, acts of the public enemy, acts of the Owner except as <br />provided in the Contract Documents, acts of another contractor in the <br />performance of a Contract with the Owner, riots, strikes, epidemics, <br />quarantine restrictions, freight embargoes, fires, floods, and <br />unusually severe weather that precludes efficient work progress. <br /> <br />b. Delays to subcontractors or suppliers for any of the causes listed in <br />subparagraph 3. (a) above when such delays have consequential <br />effect upon the completion of the work. <br /> <br />4. The Inspector or other authorized representative of the Owner shall keep a <br />written record of each day sufficient for his determination as to the inclusion <br />of that day in the computation of Contract time. Where no provision for full <br />time inspection is made, local weather records will be used to determine lost <br />days. This record shall be available for examination by the Contractor during <br />normal hours of work. In case of disagreement between the representative of
The URL can be used to link to this page
Your browser does not support the video tag.