My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Angela Street Bridge_AA 2023-0515
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
Administrative Approvals
>
Angela Street Bridge_AA 2023-0515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2023 2:05:07 PM
Creation date
5/15/2023 2:05:40 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
Angela Street Bridge
HPC Document Type
Certification
HPC Local Landmark
i. South Bend
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preventive Maintenance of Angela Boulevard Bridge <br />Over St. Joseph River January 2023 <br /> 4 <br />2. Successful bidder is required to submit Form 347, Weekly Payroll, to the <br />Engineer within 10 days of the applicable payroll date throughout the <br />duration of the Contract. <br /> <br />XI. PAYMENT <br /> <br />A. The quantities shown in the bid documents are believed to be sufficient to complete <br />the specified work, however, they are approximate and are shown for the purpose of <br />comparing bids. Payment to the Contractor will be made only for those quantities of <br />work actually completed and accepted in accordance with specifications. Major work <br />changes made in the field must be submitted for approval prior to the commencement <br />of work, or the Engineer must sign the Contractor’s daily work report on the day the <br />work is performed. Minor changes in existing items must be reviewed by the <br />Engineer in the field and documented on the Engineer’s daily report. <br /> <br />B. Payment for the various items of the contract shall be complete and final according to <br />the Field Engineer. Payment for all materials, tools, equipment, overhead and profit <br />for the item shall be completed on a progress pay estimate processed at a two (2) <br />week minimum basis. Payment shall be determined from weight tickets or shipping <br />bill furnished by the Contractor for each material delivered to the project, and upon <br />field measurements as agreed upon by the Contractor and the Engineer. Payment will <br />only be made once all paperwork including daily certifications, weight tickets, <br />change orders, payrolls, and work schedules are received for that pay period. <br /> <br />XII. AWARD AND EXECUTION <br /> <br />A. 2022 INDOT Standard Specification: 103 <br /> <br />B. Additions: <br /> <br />1. The submission of the lowest total of all unit price extensions does not <br />guarantee award of contract to the Bidder submitting such low total of <br />extensions. <br /> <br />2. If a Contract is awarded, the award shall be to the qualified bidder submitting <br />the most advantageous proposal to the Owner. The Owner shall consider in <br />its evaluations of proposals: <br /> <br />a. the total estimated amount of the contract work indicated by the total <br />of unit price extensions; and <br /> <br />b. the individual unit prices bid, with particular attention and <br />consideration of unit prices for major work items that are subject to <br />overrun; and <br /> <br />c. the probable final, as-constructed cost of the project work; and <br /> <br />d. the overall qualifications, experience, and history of satisfactorily <br />completed projects of each bidder. <br />
The URL can be used to link to this page
Your browser does not support the video tag.