Laserfiche WebLink
BID TABULATION  #122‐013 <br />#122-013 LaSalle Street Streetscape Project <br />BASE BID <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost <br />1 MOBILIZATION/DEMOBILIZATION 1 LSUM $ 350,000.00 $ 350,000.00 $ 369,843.32 $ 369,843.32 <br />2 CONSTRUCTION ENGINEERING 1 LSUM $ 1,000.00 $ 1,000.00 $ 55,000.00 $ 55,000.00 <br />3 MAINTENANCE OF TRAFFIC 1 LSUM $ 350,000.00 $ 350,000.00 $ 335,000.00 $ 335,000.00 <br />4 TEMPORARY CRUSHED AGGREGATE FOR DRAINAGE, SIZE NO.73, MOT PHASE I 180 TON $ 45.00 $ 8,100.00 $ 45.00 $ 8,100.00 <br />5 TEMPORARY CRUSHED AGGREGATE FOR DRAINAGE, SIZE NO.53, MOT PHASE I 180 TON $ 45.00 $ 8,100.00 $ 45.00 $ 8,100.00 <br />6 CPM SCHEDULE 1 LSUM $ 5,000.00 $ 5,000.00 $ 15,000.00 $ 15,000.00 <br />7 VIDEO RECORD 1 LSUM $ 5,000.00 $ 5,000.00 $ 7,500.00 $ 7,500.00 <br />8 CLEARING RIGHT‐OF‐WAY 1 LSUM $ 200,000.00 $ 200,000.00 $ 400,000.00 $ 400,000.00 <br />9 COMMON EXCAVATION, UNDISTRIBUTED 4550 CYS $ 45.00 $ 204,750.00 $ 50.00 $ 227,500.00 <br />10 SURFACE MILLING, ASPHALT, 2 IN 10609 SYS $ 10.00 $ 106,090.00 $ 4.00 $ 42,436.00 <br />11 SIDEWALK, CONCRETE, REMOVE 2683 SYS $ 15.00 $ 40,245.00 $ 9.00 $ 24,147.00 <br />12 CURB, CONCRETE, REMOVE 3427 LFT $ 12.00 $ 41,124.00 $ 7.00 $ 23,989.00 <br />13 TEMPORARY EROSION CONTROL 1 LSUM $ 25,000.00 $ 25,000.00 $ 50,000.00 $ 50,000.00 <br />14 TEMPORARY INLET PROTECTION 81 EACH $ 250.00 $ 20,250.00 $ 275.00 $ 22,275.00 <br />15 COMPACTED STRUCTURAL BACKFILL 5365 CYS $ 50.00 $ 268,250.00 $ 10.00 $ 53,650.00 <br />16 CONCRETE CURB 4849 LFT $ 50.00 $ 242,450.00 $ 35.00 $ 169,715.00 <br />17 CONCRETE RIBBON CURB 1144 LFT $ 45.00 $ 51,480.00 $ 40.00 $ 45,760.00 <br />18 CONCRETE CURB & GUTTER 172 LFT $ 70.00 $ 12,040.00 $ 50.00 $ 8,600.00 <br />19 CONCRETE SEPARATION CURB, 20 IN 931 LFT $ 100.00 $ 93,100.00 $ 68.00 $ 63,308.00 <br />20 PCCP, PLAIN, 10 IN 4743 SYS $ 135.00 $ 640,305.00 $ 135.00 $ 640,305.00 <br />21 PCCP, APPROACH, 9 IN 747 SYS $ 145.00 $ 108,315.00 $ 100.00 $ 74,700.00 <br />22 PCCP, COLORED B1, 10 IN 324 SYS $ 165.00 $ 53,460.00 $ 180.00 $ 58,320.00 <br />23 PCCP, COLORED B2, 10 IN 875 SYS $ 165.00 $ 144,375.00 $ 180.00 $ 157,500.00 <br />24 PCCP, MOUNTABLE CONCRETE CURB ISLAND, 2 IN REVEAL, 12 IN 40 SYS $ 225.00 $ 9,000.00 $ 180.00 $ 7,200.00 <br />25 CONCRETE, PERVIOUS 35 SYS $ 125.00 $ 4,375.00 $ 285.00 $ 9,975.00 <br />26 COMPACTED AGGREGATE BASE, INDOT NO. 53 2880 TON $ 60.00 $ 172,800.00 $ 65.00 $ 187,200.00 <br />27 SIDEWALK, CONCRETE, 5 IN 4190 SYS $ 100.00 $ 419,000.00 $ 70.00 $ 293,300.00 <br />28 CURB RAMP, CONCRETE 556 SYS $ 300.00 $ 166,800.00 $ 170.00 $ 94,520.00 <br />29 HEADER, CONCRETE 6 IN 1144 LFT $ 45.00 $ 51,480.00 $ 30.00 $ 34,320.00 <br />30 HEADER, CONCRETE 12 IN 538 LFT $ 95.00 $ 51,110.00 $ 50.00 $ 26,900.00 <br />31 HMA SURFACE, TYPE B 1308 TON $ 180.00 $ 235,440.00 $ 120.00 $ 156,960.00 <br />32 HMA INTERMEDIATE, TYPE B 155 TON $ 160.00 $ 24,800.00 $ 150.00 $ 23,250.00 <br />33 HMA BASE, TYPE B 365 TON $ 150.00 $ 54,750.00 $ 110.00 $ 40,150.00 <br />34 TACK COAT 11739 SYS $ 3.00 $ 35,217.00 $ 1.00 $ 11,739.00 <br />35 HMA ASPHALT PATCHING 145 SYS $ 200.00 $ 29,000.00 $ 115.00 $ 16,675.00 <br />36 PERMEABLE PAVER BLOCK SYSTEM 888 SYS $ 120.00 $ 106,560.00 $ 161.30 $ 143,234.40 <br />37 SIDEWALK PAVERS 581 SYS $ 250.00 $ 145,250.00 $ 154.38 $ 89,694.78 <br />38 AGGREGATE, NO. 11 CRUSHED LIMESTONE 92 TON $ 60.00 $ 5,520.00 $ 167.00 $ 15,364.00 <br />39 AGGREGATE BASE, INDOT NO. 8 CRUSHED LIMESTONE 550 TON $ 60.00 $ 33,000.00 $ 75.00 $ 41,250.00 <br />40 DECORATIVE PAVER BAND 1210 LFT $ 25.00 $ 30,250.00 $ 6.54 $ 7,913.40 <br />41 LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. 1303 LFT $ 2.50 $ 3,257.50 $ 2.00 $ 2,606.00 <br />42 LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN. 3598 LFT $ 2.50 $ 8,995.00 $ 2.00 $ 7,196.00 <br />43 LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN. 43 LFT $ 2.50 $ 107.50 $ 2.00 $ 86.00 <br />44 LINE, THERMOPLASTIC, BROKEN, YELLOW, 4 IN. 300 LFT $ 2.50 $ 750.00 $ 2.00 $ 600.00 <br />45 LINE, THERMOPLASTIC, SOLID, WHITE, 8 IN. 193 LFT $ 3.00 $ 579.00 $ 4.00 $ 772.00 <br />46 LINE, THERMOPLASTIC, SOLID, YELLOW, 8 IN. 438 LFT $ 3.00 $ 1,314.00 $ 4.00 $ 1,752.00 <br />47 LINE, THERMOPLASTIC, SOLID, WHITE, 24 IN. 912 LFT $ 15.00 $ 13,680.00 $ 12.00 $ 10,944.00 <br />48 TRANSVERSE MARKING, THERMOPLASTIC, PARKING LINE, WHITE 4 IN. 427 LFT $ 2.50 $ 1,067.50 $ 4.00 $ 1,708.00 <br />49 TRANSVERSE MARKING, THERMOPLASTIC, PARKING LINE, BLUE 4 IN. 53 LFT $ 2.50 $ 132.50 $ 10.00 $ 530.00 <br />50 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, WHEELCHAIR SYMBOL 4 EACH $ 400.00 $ 1,600.00 $ 400.00 $ 1,600.00 <br />51 TRANSVERSE MARKING, THERMOPLASTIC, CROSSHATCH LINE, WHITE, 6 IN. 1604 LFT $ 2.50 $ 4,010.00 $ 4.00 $ 6,416.00 <br />52 TRANSVERSE MARKING, THERMOPLASTIC, CROSSHATCH LINE, WHITE, 12 IN. 46 LFT $ 7.00 $ 322.00 $ 5.00 $ 230.00 <br />53 TRANSVERSE MARKING, THERMOPLASTIC, CROSSHATCH LINE, YELLOW, 12 IN. 73 LFT $ 7.00 $ 511.00 $ 5.00 $ 365.00 <br />54 TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN. 281 LFT $ 15.00 $ 4,215.00 $ 12.00 $ 3,372.00 <br />55 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, BIKE SYMBOL 14 EACH $ 400.00 $ 5,600.00 $ 400.00 $ 5,600.00 <br />56 PAVEMENT MESSAGE MARKING, THERMOPLASTIC, CONVENTIONAL BIKE SYMBOL 3 EACH $ 400.00 $ 1,200.00 $ 400.00 $ 1,200.00 <br />57 PAVEMENT MESSAGE MARKING, THERMOPLASTIC LANE INDICATION ARROW 6 EACH $ 400.00 $ 2,400.00 $ 300.00 $ 1,800.00 <br />58 TRANSVERSE, THERMOPLASTIC, GREEN 4845 SFT $ 10.00 $ 48,450.00 $ 16.00 $ 77,520.00 <br />59 LINE, EPOXY, SOLID, WHITE, 4 IN. 665 LFT $ 2.50 $ 1,662.50 $ 3.30 $ 2,194.50 <br />60 LINE, EPOXY, SOLID, YELLOW, 4 IN. 2202 LFT $ 2.50 $ 5,505.00 $ 3.30 $ 7,266.60 <br />61 LINE, EPOXY, BROKEN, WHITE, 4 IN. 72 LFT $ 2.50 $ 180.00 $ 3.45 $ 248.40 <br />62 LINE, EPOXY, BROKEN, YELLOW, 4 IN. 617 LFT $ 2.50 $ 1,542.50 $ 3.45 $ 2,128.65 <br />63 LINE, EPOXY, SOLID, WHITE, 8 IN. 701 LFT $ 3.00 $ 2,103.00 $ 4.60 $ 3,224.60 <br />64 LINE, EPOXY, SOLID, YELLOW, 8 IN. 1196 LFT $ 3.00 $ 3,588.00 $ 4.60 $ 5,501.60 <br />65 LINE, EPOXY, SOLID, WHITE, 24 IN. 229 LFT $ 15.00 $ 3,435.00 $ 16.25 $ 3,721.25 <br />66 TRANSVERSE MARKING, EPOXY, CROSSWALK LINE, WHITE, 6 IN. 216 LFT $ 2.50 $ 540.00 $ 8.00 $ 1,728.00 <br />67 TRANSVERSE MARKING, EPOXY, CROSSHATCH LINE, WHITE, 12 IN. 374 LFT $ 7.00 $ 2,618.00 $ 9.00 $ 3,366.00 <br />68 TRANSVERSE MARKING, EPOXY, CROSSHATCH LINE, YELLOW 12 IN. 276 LFT $ 7.00 $ 1,932.00 $ 9.00 $ 2,484.00 <br />69 TRANSVERSE MARKING, EPOXY, YIELD LINE, WHITE, 24 IN 75 LFT $ 15.00 $ 1,125.00 $ 17.25 $ 1,293.75 <br />70 TRANSVERSE MARKING, EPOXY, STOP LINE, WHITE, 24 IN 79 LFT $ 15.00 $ 1,185.00 $ 16.25 $ 1,283.75 <br />71 PAVEMENT MESSAGE MARKING, THERMOPLASTIC , BIKE SYMBOL 22 EACH $ 400.00 $ 8,800.00 $ 400.00 $ 8,800.00 <br />72 PAVEMENT MESSAGE MARKING, EPOXY LANE INDICATION ARROW 9 EACH $ 400.00 $ 3,600.00 $ 355.00 $ 3,195.00 <br />73 PAVEMENT MESSAGE MARKING, EPOXY CHEVRON 2 EACH $ 400.00 $ 800.00 $ 475.00 $ 950.00 <br />74 PAVEMENT MESSAGE MARKING, EPOXY, PED XING 4 EACH $ 400.00 $ 1,600.00 $ 400.00 $ 1,600.00 <br />75 PAVEMENT MESSAGE MARKING, THERMOPLASTIC , SHARED LANE 1 EACH $ 400.00 $ 400.00 $ 500.00 $ 500.00 <br />76 BIKE LANE DELINEATOR 9 EACH $ 250.00 $ 2,250.00 $ 700.00 $ 6,300.00 <br />77 HEMISPHERICAL CAMERA DETECTION SYSTEM, LASALLE AVE/HILL ST 1 LSUM $ 30,000.00 $ 30,000.00 $ 30,400.00 $ 30,400.00 <br />78 HEMISPHERICAL CAMERA DETECTION SYSTEM, LASALLE AVE/NILES AVE 1 LSUM $ 30,000.00 $ 30,000.00 $ 30,400.00 $ 30,400.00 <br />79 HEMISPHERICAL CAMERA DETECTION SYSTEM, DR MLK JR BLVD/COLFAX AVE 1 LSUM $ 30,000.00 $ 30,000.00 $ 30,400.00 $ 30,400.00 <br />80 TRAFFIC SIGNAL POLE FOUNDATION 8 EACH $ 2,500.00 $ 20,000.00 $ 1,600.00 $ 12,800.00 <br />81 PAINTING TRAFFIC SIGNAL POLES & MAST ARMS BLACK 1 LSUM $ 1,000.00 $ 1,000.00 $ 11,000.00 $ 11,000.00 <br />82 RELOCATE TRAFFIC SIGNAL POLE & MAST ARM 8 EACH $ 500.00 $ 4,000.00 $ 1,800.00 $ 14,400.00 <br />83 TRAFFIC SIGNAL PEDESTAL FOUNDATION, TYPE A 20 EACH $ 800.00 $ 16,000.00 $ 440.00 $ 8,800.00 <br />84 PEDESTRIAN TRAFFIC SIGNAL PEDESTAL W/BASE 16 EACH $ 1,500.00 $ 24,000.00 $ 1,100.00 $ 17,600.00 <br />85 BIKE TRAFFIC SIGNAL PEDESTAL W/BASE 4 EACH $ 1,500.00 $ 6,000.00 $ 1,500.00 $ 6,000.00 <br />86 TRAFFIC SIGNAL HEAD, 3‐SECTION 20 EACH $ 1,000.00 $ 20,000.00 $ 900.00 $ 18,000.00 <br />87 BIKE TRAFFIC SIGNAL HEAD, 3‐SECTION 4 EACH $ 1,200.00 $ 4,800.00 $ 980.00 $ 3,920.00 <br />88 "WALK/DON’T WALK"SYMBOL PEDESTRIAN SIGNAL INDICATOR W/COUNTDOWN 16 EACH $ 1,200.00 $ 19,200.00 $ 600.00 $ 9,600.00 <br />89 PEDESTRIAN PUSH BUTTON ASSEMBLY W/SIGN 16 EACH $ 1,000.00 $ 16,000.00 $ 280.00 $ 4,480.00 <br />90 TRAFFIC SIGNAL CABLE 1 LSUM $ 2,000.00 $ 2,000.00 $ 12,200.00 $ 12,200.00 <br />91 TRAFFIC SIGNAL CONDUIT, SCH 80 PVC, UNDISTRIBUTED 100 LFT $ 40.00 $ 4,000.00 $ 9.75 $ 975.00 <br />92 TRAFFIC SIGNAL HANDHOLE, UNDISTRIBUTED 4 EACH $ 1,500.00 $ 6,000.00 $ 1,000.00 $ 4,000.00 <br />93 REMOVE & REPLACE TRAFFIC SIGNAL ROADWAY LOOP DETECTION SYSTEM IN  <br />APPROACH LASALLE/EDDY ST 1 LSUM $ 10,000.00 $ 10,000.00 $ 3,650.00 $ 3,650.00 <br />94 PEDESTRIAN CROSSING SIGNAGE, MISC.1 LSUM $ 80,000.00 $ 80,000.00 $ 14,350.00 $ 14,350.00 <br />95 LIGHT STANDARD, TYPE A 34 EACH $ 12,000.00 $ 408,000.00 $ 7,400.00 $ 251,600.00 <br />96 LIGHT STANDARD, TYPE B 10 EACH $ 14,000.00 $ 140,000.00 $ 10,500.00 $ 105,000.00 <br />97 LIGHT STANDARD FOUNDATION 40 EACH $ 2,400.00 $ 96,000.00 $ 980.00 $ 39,200.00 <br />98 ELECTRICAL WIRING 3850 LFT $ 9.00 $ 34,650.00 $ 9.50 $ 36,575.00 <br />99 PVC SCHEDULE 80 CONDUIT, 2 IN 3020 LFT $ 12.00 $ 36,240.00 $ 9.30 $ 28,086.00 <br />100 ELECTRIC SERVICE POINT, TESCO, SINGLE METER 2 EACH $ 11,750.00 $ 23,500.00 $ 9,000.00 $ 18,000.00 <br />101 ELECTRIC SERVICE POINT, TESCO, DUAL METER 1 EACH $ 11,750.00 $ 11,750.00 $ 8,900.00 $ 8,900.00 <br />102 HANDHOLE, LIGHTING 40 EACH $ 1,000.00 $ 40,000.00 $ 975.00 $ 39,000.00 <br />103 MISCELLANEOUS ELECTRICAL EQUIPMENT 1 LSUM $ 20,000.00 $ 20,000.00 $ 2,100.00 $ 2,100.00 <br />104 FIRE HYDRANT ASSEMBLY, REMOVE 5 EACH $ 1,000.00 $ 5,000.00 $ 4,500.00 $ 22,500.00 <br />105 REMOVE EXISTING 12" WATER MAIN 2075 LFT $ 20.00 $ 41,500.00 $ 25.00 $ 51,875.00 <br />Engineer's Estimate HRP Construction Inc. <br />H:\2021 Projects\2021‐0489\07_Bidding\Bid Tabulation\122‐013 JPR Bid Tabulation 2022‐12‐20.xlsx