Laserfiche WebLink
BID TABULATION  #122‐013 <br />106 CUT AND CAP WATER MAIN 7 EACH $ 200.00 $ 1,400.00 $ 6,000.00 $ 42,000.00 <br />107 D.I. WATER MAIN, 12 IN, CL52 2320 LFT $ 110.00 $ 255,200.00 $ 165.00 $ 382,800.00 <br />108 12 IN TO 12 IN TAPPING VALVE & SLEEVE 11 EACH $ 8,000.00 $ 88,000.00 $ 12,500.00 $ 137,500.00 <br />109 12 IN GATE VALVE & BOX 18 EACH $ 4,000.00 $ 72,000.00 $ 7,000.00 $ 126,000.00 <br />110 FIRE HYDRANT ASSEMBLY 5 EACH $ 6,000.00 $ 30,000.00 $ 10,000.00 $ 50,000.00 <br />111 6 IN D.I. WATER SERVICE 12 EACH $ 4,000.00 $ 48,000.00 $ 8,000.00 $ 96,000.00 <br />112 2 IN COPPER WATER SERVICE 12 EACH $ 1,000.00 $ 12,000.00 $ 7,000.00 $ 84,000.00 <br />113 HDPE PERFORATED PIPE, 12 IN 1144 LFT $ 25.00 $ 28,600.00 $ 125.00 $ 143,000.00 <br />114 FLEXIBLE UNDERDRAIN PIPE, 6 IN, IN NO. 8 CRUSHED LIMESTONE & GEOTEXTILE WRAP 130 LFT $ 25.00 $ 3,250.00 $ 70.00 $ 9,100.00 <br />115 STORM SEWER PIPE, 12 IN 1491 LFT $ 120.00 $ 178,920.00 $ 70.00 $ 104,370.00 <br />116 STORM SEWER PIPE, 15 IN 430 LFT $ 140.00 $ 60,200.00 $ 90.00 $ 38,700.00 <br />117 CORE AND BOOT AT STORM SEWER STRUCTURE, UNDISTRIBUTED 2 EACH $ 2,400.00 $ 4,800.00 $ 4,000.00 $ 8,000.00 <br />118 STORM INLET, 2 FT DIA. 29 EACH $ 3,000.00 $ 87,000.00 $ 3,500.00 $ 101,500.00 <br />119 STORM MANHOLE, MODIFIED, 4FT DIA.7 EACH $ 6,000.00 $ 42,000.00 $ 7,000.00 $ 49,000.00 <br />120 STORM MANHOLE, 4 FT DIA.5 EACH $ 6,000.00 $ 30,000.00 $ 7,000.00 $ 35,000.00 <br />121 STORM MANHOLE, 5 FT DIA.3 EACH $ 9,000.00 $ 27,000.00 $ 8,500.00 $ 25,500.00 <br />122 STORM MANHOLE, 6 FT DIA.3 EACH $ 10,000.00 $ 30,000.00 $ 9,500.00 $ 28,500.00 <br />123 STORM MANHOLE, MODIFIED, 6 FT DIA.2 EACH $ 10,000.00 $ 20,000.00 $ 9,500.00 $ 19,000.00 <br />124 STORM SADDLE MANHOLE, MODIFIED, 4 FT DIA.2 EACH $ 8,000.00 $ 16,000.00 $ 8,500.00 $ 17,000.00 <br />125 STORM SADDLE MANHOLE, 5 FT DIA. 1 EACH $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 <br />126 STORM SADDLE MANHOLE, 6 FT DIA.4 EACH $ 12,000.00 $ 48,000.00 $ 11,000.00 $ 44,000.00 <br />127 VIDEO INSPECTION OF STORM SEWER 1910 LFT $ 2.00 $ 3,820.00 $ 1.20 $ 2,292.00 <br />128 ADJUST STRUCTURE TO GRADE 59 EACH $ 800.00 $ 47,200.00 $ 400.00 $ 23,600.00 <br />129 RECONSTRUCTED STRUCTURE, UNDISTURBED 50 LFT $ 500.00 $ 25,000.00 $ 200.00 $ 10,000.00 <br />130 UTILITY RELOCATION ALLOWANCE 1 ALLOW $ 25,000.00 $ 25,000.00 $ 25,000.00 $ 25,000.00 <br />131 SHEET SIGN, W/LEGEND, REFLECTIVE 195 SFT $ 30.00 $ 5,850.00 $ 16.00 $ 3,120.00 <br />132 SIGN POST, SQUARED, TYPE 2 385 LFT $ 25.00 $ 9,625.00 $ 12.00 $ 4,620.00 <br />133 OVERSTORY TREE, 2‐1/2 IN CALIPER 88 EACH $ 750.00 $ 66,000.00 $ 630.00 $ 55,440.00 <br />134 TREE GRATE 37 EACH $ 5,000.00 $ 185,000.00 $ 8,500.00 $ 314,500.00 <br />135 SODDING, NURSERY AND TOPSOIL 1980 SYS $ 45.00 $ 89,100.00 $ 29.00 $ 57,420.00 <br />136 TREE WATERING SYSTEM 84 EACH $ 50.00 $ 4,200.00 $ 30.00 $ 2,520.00 <br />137 BENCH 3 EACH $ 5,000.00 $ 15,000.00 $ 6,000.00 $ 18,000.00 <br />138 TRASH RECEPTACLE 6 EACH $ 3,500.00 $ 21,000.00 $ 5,500.00 $ 33,000.00 <br />139 BICYCLE RACK 8 EACH $ 1,200.00 $ 9,600.00 $ 1,500.00 $ 12,000.00 <br />140 VAULT CLOSURE ‐ 441 E. LASALLE AVE 1 LSUM $ 40,000.00 $ 40,000.00 $ 60,000.00 $ 60,000.00 <br />141 LINE STOP 1 EACH $ 4,500.00 $ 4,500.00 $ 15,000.00 $ 15,000.00 <br />142 INSERTA‐VALVE 1 EACH $ 7,500.00 $ 7,500.00 $ 20,000.00 $ 20,000.00 <br />143 PVC SCHEDULE 80 CONDUIT, 3 IN 500 LFT $ 15.00 $ 7,500.00 $ 27.00 $ 13,500.00 <br />144 RAILROAD SPUR 4500 LFT $ 10.00 $ 45,000.00 $ 5.00 $ 22,500.00 <br />145 RAILROAD TIE 2960 EACH $ 12.00 $ 35,520.00 $ 15.00 $ 44,400.00 <br />146 TEMPORARY BUSINESS SERVICE SIGN, UNDISTRIBUTED 10 EACH $ 125.00 $ 1,250.00 $ 300.00 $ 3,000.00 <br />147 EPOXY COATING OF STORM INLET INTERIOR, UNDISTRIBUTED 5 EACH $ 2,000.00 $ 10,000.00 $ 2,447.00 $ 12,235.00 <br />148 EPOXY COATING OF STORM MANHOLE INTERIOR, UNDISTRIBUTED 5 EACH $ 3,000.00 $ 15,000.00 $ 3,119.00 $ 15,595.00 <br />BASE BID TOTAL $ 7,638,518.00 $ 7,395,000.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on January 3rd, 2022 <br />Mark Wilson, Professional Engineer <br />Responsible Bidder Documentation & Letter YES <br />Bid Bond YES <br />MWBE Goals Met YES <br />MWBE Good Faith Effort YES <br />Non-Collusion Affidavit YES <br />Engineer's Estimate HRP Construction Inc. <br />H:\2021 Projects\2021‐0489\07_Bidding\Bid Tabulation\122‐013 JPR Bid Tabulation 2022‐12‐20.xlsx