My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - Coal Line Trail, Phase III Proj No. 123-007 - Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2023 11:32:45 AM
Creation date
3/14/2023 11:32:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
3/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COLLEGE STWERWINSKI ST <br /> | 8 <br />PROJECT APPROACH: DES. #2201235 <br />SURVEY <br />Based on the scope of the project, the JPR survey team <br />will be able to gather topographic survey data safely and <br />efficiently by utilizing the latest drone technology. Since <br />necessary underground data will be minimal, the survey <br />team will be able to complete the survey faster than they <br />would by using only traditional survey methods - saving <br />the City time and money on the overall project. <br />RIGHT-0F-WAY ACQUISITION <br />As with utility coordination, the JPR team does not anticipate <br />any right-of-way acquisition necessary to complete the <br />project. If permanent or temporary right-of-way is required, <br />it will become a critical path item for this project. The JPR <br />team, along with Dodd Title, will investigate the need for <br />right-of-way early in the design process to prevent any <br />delays. <br />TRAIL SECTION <br />To expedite design processes, the JPR team recommends <br />using the INDOT standard section for a non-motorized <br />vehicle use facility. This section will match the existing Coal <br />Line Trail sections as well as enable the design to progress <br />more quickly with less submittals. <br />LANDSCAPING PLAN <br />While routing the trail alongside College Street does <br />not present many opportunities for attractive landscape <br />elements, the path utilizing the abandoned railroad has <br />ample area to develop an attractive plan. In addition to <br />planting areas, including decorative elements at road <br />crossings will make them more noticeable to motorists. <br />The JPR team has experience developing everlasting <br />landscape plans, for multiple municipalities, that any trail <br />user would be proud of. <br />By utilizing the west side of College Street, the proposed trail encounters <br />fewer building obstructions and potential right-of-way conflicts <br />City of South Bend | PE Services for Coal Line Trail Phase 3 in the LaPorte District - Des #2201235
The URL can be used to link to this page
Your browser does not support the video tag.