Laserfiche WebLink
03 City of South Bend, Indiana | Safe Routes to School (SRTS) – Kennedy Academy | February 14, 2023 <br />STAFF QUALIFICATIONSBRIAN ARTERBERY, PE - VOLKERT <br />PROJECT MANAGER <br />8.1 NON COMPLEX ROADWAY DESIGN <br />Mr. Arterbery, PE joined Volkert in 2022 with almost 30 years of experience in management of transportation projects; development of project <br />scopes, schedules, and budgets; staff development; and the design, review and QA/QC of technical submittals to clients. Brian’s expertise includes <br />multiple local Federal-Aid projects throughout Indiana. <br />B.S. CIVIL ENGINEERING <br />PURDUE UNIVERSITY <br />WEST LAFAYETTE, IN <br />INDOT <br />VETERAN <br />INDOTEXPERIENCE <br />Brian’s RELEVANT PROJECT EXPERIENCE <br />City of South Bend Experience <br />Project Manager and Engineer of Record <br />• East Bank Phase 2 <br />• East Bank Phase 5 <br />• Lincolnway West Road Diet - William St to SB Airport <br />• South Bend Fire Training Center <br />Local Experience <br />Project Manager and Engineer of Record <br />• Cleveland Road from Riverside Drive to SR 933 <br />• Lincolnway West Relocation including two roundabouts <br />• University of Notre Dame Campus Roads Project, including Edison Road, <br />Twyckenham Drive and Douglas Road <br />Federal Aid Project Experience <br />Project Manager and Engineer of Record <br />• Roundabout at Cleveland Road and Ash Road <br />• Roundabout at Edison Road and Ash Road <br />• Blackiston Mill Road Improvements, Phase 1 and 2 <br />• Old US 30 - Phase 4 Improvements <br />• Bittersweet Road and Day Road Intersection Improvement <br />• Darden Road Reconstruction <br />• City of Valparaiso SRTS <br />• Dunes Kankakee Trail <br />• Jackson Road Landfill Multi-Use Path <br />“Brian Arterbery is a professional that has great communication & follow <br />through. He was able to find 21% cost savings & delivered the FT <br />documents on 11/27/17 for the 1/31/17 RFC. The FT documents were <br />submitted correctly. There were no permits needed for this location.” <br /> – INDOT Reviewer Comment <br />“Brian Arterbery did a great job with this bundled contract that had three <br />schedule timelines that needed to be fast tracked to them all on the same <br />RFC date. The design team was able to find a million-dollar cost savings by working with hydraulics & construction to find lower cost <br />alternatives. The unusual bundling was challenging & the team responded <br />quickly to inquiries to find solutions.” <br /> – INDOT Reviewer Comment <br />TESTIMONIALS <br />Brian has designed over 200 ADA Curb Ramps to INDOT standards over the last 4 years.