My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Safe Roads to School Kennedy School - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - Safe Roads to School Kennedy School - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2023 1:16:54 PM
Creation date
2/14/2023 1:16:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
2/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
UNITED CONSULTING // City of South Bend - Safe Routes to School (Des #2201237)11 <br />SAFE ROUTES TO SCHOOL <br />KENNEDY ACADEMY <br />CLIENT: CITY OF SOUTH BEND, IN <br />This project constructs 1.5-miles of the Coal Line Trail along the abandoned <br />Norfolk Southern Railroad line in South Bend, Indiana. The trail consists of a <br />12’ wide HMA multi-use path with lighting, including a 12’ wide spur for a grade <br />separated connection. The trail will provide pedestrian and cyclist safety as <br />well as connectivity to other existing city of South Bend trails and adjoining <br />neighborhoods. <br />A highlight of the project is the repurposing of the existing seven span <br />abandoned railroad bridge across the St. Joseph River. This bridge will connect <br />pedestrian facilities from Riverside Drive across the St. Joseph River to Angela <br />Boulevard and to the East Bank Trail. United completed an in-depth inspection <br />of the existing structure including underwater inspection of the piers and arms- <br />length inspection of superstructure. <br />The pedestrian bridge will use the existing superstructure elements and provide <br />a 16’-0” wide trail that will allow some separation for cyclists and walkers. The <br />existing bridge will require structural repairs and the trail will be constructed <br />with a concrete deck and have an open railing and will have multiple locations <br />for pedestrian overlooks. <br />Services Provided by United: <br /> Survey <br /> Environmental <br /> Permitting <br /> Trail Design <br /> Utility Coordination <br /> Pavement Design <br /> Public Outreach <br /> Lighting Design <br /> Bridge Inspection <br /> Bridge Design <br /> Load Rating <br /> Scour Analysis <br />RELEVANT PROJECT EXPERIENCE <br />Coal Line Trail over St. Joseph River <br />SOUTH BEND - COAL LINE TRAIL PHASES I & II <br />US 31US 31PH A SEPHASE <br />1 PH A SEPHASE <br />2 <br />US 20US 20 <br />ST. JOSEPH RIVER <br />ST. JOSEPH RIVER <br />P <br />O <br />R <br />T <br />A <br />G <br />E <br /> <br />A <br />V <br />E <br />. <br />P <br />O <br />R <br />T <br />A <br />G <br />E <br /> <br />A <br />V <br />E <br />.
The URL can be used to link to this page
Your browser does not support the video tag.