Laserfiche WebLink
PROJECT:SOUTH BEND 2022 ROAD REHAB Created By:LSG Checked by: <br />STREET:IRONWOOD DRIVE AND IRELAND ROAD INTERSECTION Date:12/16/2022 Date Checked: <br />MATERIAL:CONCRETE PAVEMENT <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 CONSTRUCTION ENGINEERING (3%)1.00 LS $34,700.00 $34,700.00 <br />2 MOBILIZATION AND DEMOBILIZATION (5%)1.00 LS $57,900.00 $57,900.00 <br />3 CLEARING RIGHT OF WAY (1%)1.00 LS $11,600.00 $11,600.00 <br />4 CONCRETE PAVEMENT REMOVAL 6655.00 SYS $16.00 $106,480.00 <br />5 EXCAVATION, COMMON 222.00 CYS $78.00 $17,316.00 <br />6 SUBGRADE TREATMENT, TYPE II 7225.00 SYS $17.00 $122,825.00 <br />7 COMPACTED AGGREGATE NO. 53 444.00 TON $55.00 $24,420.00 <br />8 SUBBASE NO. 53 2355.00 TON $37.00 $87,135.00 <br />7 PCCP FOR PAVEMENT, 10 IN 6655.00 SYS $65.00 $432,575.00 <br />8 D-1 CONSTRUCTION JOINT 3470.00 LFT $15.00 $52,050.00 <br />9 SIDEWALK, CONCRETE 112.00 SYS $111.00 $12,432.00 <br />10 CURB RAMP CONCRETE 38.00 SYS $213.00 $8,094.00 <br />11 DETECTABLE WARNING SURFACES 70.00 SYS $236.00 $16,520.00 <br />12 COMBINATION CURB & GUTTER, TYPE B 1239.00 LFT $34.00 $42,126.00 <br />13 PCCP FOR APPROACHES, 9 IN 157.00 SYS $129.00 $20,253.00 <br />14 SODDING, NURSERY 333.00 SYS $23.00 $7,659.00 <br />15 TOPSOIL 19.00 CYS $160.00 $3,040.00 <br />16 TRAFFIC SIGNAL 1.00 LS $200,000.00 $200,000.00 <br />17 CASTING, FURNISH & ADJUST TO GRADE 4.00 EACH $1,250.00 $5,000.00 <br />18 MAINTAINING TRAFFIC (15%)1.00 LS $173,700.00 $173,700.00 <br />CONTINGENCY (20%)1.00 LS $231,600.00 $231,600.00 <br />Total Cost Estimate $1,667,425.00 <br />DESCRIPTIONItem No. <br />PROBABLE CONSTRUCTION COST ESTIMATE