Laserfiche WebLink
PROJECT:South Bend - Cleveland Rd & Ameritech Dr Intersection Improvements Created By:LSG Checked by: <br />Project No:Date:9/29/2022 Date Checked: <br />Updated By:LSG <br />Date Updated:12/16/2022 <br />QUANTITY UNIT UNIT COST ITEM COST <br />1 Construction Engineering (5%)1 LS $19,100.00 $19,100.00 <br />2 Mobilization and Demobilization (5%)1 LS $19,100.00 $19,100.00 <br />3 Clearing Right of Way (2%)1 LS $7,700.00 $7,700.00 <br />4 Maintenance of Traffic (15%)1 LS $57,400.00 $57,400.00 <br />5 Erosion Control (1%)1 LS $3,800.00 $3,800.00 <br />6 Pavement Removal 1345 SYS $18.00 $24,210.00 <br />7 Center Curb, Concrete, Remove 45 SYS $68.00 $3,060.00 <br />8 Excavation, Common 481 CYS $85.00 $40,885.00 <br />9 Excavation, Unclassified 49 CYS $94.00 $4,606.00 <br />10 Subgrade Treatment, Type I 1842 SYS $15.00 $27,630.00 <br />11 Compacted Aggregate, No. 53 835 TON $46.00 $38,410.00 <br />12 HMA Surface, Type B 43 TON $180.00 $7,740.00 <br />13 HMA Intermediate, Type B 72 TON $140.00 $10,080.00 <br />14 HMA Base, Type B 229 TON $110.00 $25,190.00 <br />15 Asphalt for Tack Coat 1038 SYS $1.00 $1,038.00 <br />16 PCCP, 11.5"1323 SYS $120.00 $158,760.00 <br />17 D-1 Contraction Joint 700 LFT $30.00 $21,000.00 <br />18 Center Curb, D, Concrete 5 SYS $100.00 $500.00 <br />19 Line, Thermoplastic, Broken, White, 4"280 LFT $3.00 $840.00 <br />20 Line, Thermoplastic, Solid, White, 4"2260 LFT $2.00 $4,520.00 <br />21 Line, Thermoplastic, Solid, Yellow, 4"1060 LFT $2.00 $2,120.00 <br />22 Grooving for Pavement Markings 3600 LFT $2.00 $7,200.00 <br />23 Transverse Marking, Thermoplastic, Crosshatch Line, White, 8"360 LFT $8.00 $2,880.00 <br />24 Transverse Marking, Thermoplastic, Stop Line, White, 24"84 LFT $12.00 $1,008.00 <br />25 Pavement Message Marking, Thermoplastic, Lane Indication Arrow 3 EA $210.00 $630.00 <br />26 Traffic Signal Head, Realign 2 EA $300.00 $600.00 <br />Contingency (20%)1 LS $76,600.00 $76,600.00 <br />Total Construction Cost Estimate $566,607.00 <br />PROBABLE OPINION OF CONSTRUCTION COST ESTIMATE <br />Item No.DESCRIPTION Project: Cleveland Rd & Ameritech Dr Intersection