Laserfiche WebLink
24.2022 Asphalt Materials Bid –Received two (2)bids on 3.22.2022 <br />a.Awarded to Rieth-Riley Construction Co.,Inc. on 4.12.2022 <br />b.Contract Goals: <br />i.MBE:0.13%[met via 1st Class Logistics 0.13%] <br />ii.WBE:0.18%[met via Montgomery Trucking 0.18%] <br />c.Contract Unit Prices: <br />i.HMA 64-28P Surface:$77/TON <br />ii.HMA 70-22P Surface:$77/TON <br />iii.HMA Binder:$70/TON <br />iv.HMA Base:$49/TON <br />v.CMA Patch:$90/TON <br />vi.Cold Mix:$120/TON <br />vii.Driver &Truck:$122/HR <br />d.PM:Scott Kreeger <br />e.Project Duration (Days):256 <br />25.2022 Contractor Paving,Round 1 –Received two (2)bids on 3.22.2022 <br />a.Awarded base bid and alternate no.1 to Rieth-Riley Construction Co.,Inc.on 4.12.2022 <br />b.Contract Goals: <br />i.Base MBE:3.92%[met via 1st Class Logistics 4.13%] <br />ii.Base WBE:5.58%[met via Traffic Control Specialists 2.7%,CE Hughes Milling <br />3.6%,State Barricading 1.1%,Hawk Enterprises,0.03%] <br />iii.Alt No.1 MBE:3.85%[met via 1st Class Logistics 4.1%] <br />iv.Alt No.1 WBE:5.48%[met via CE Hughes Milling 7.8%,State Barricading 1%] <br />c.Contract Amount:$1,350,781.84 <br />d.PM:Scott Kreeger <br />e.NTP: <br />f.Project Duration (Days): <br />g.PCA TBD <br />26.2022 VPA Athletic Court Renovations –No bids on 4.12.2022 <br />a.Bid award 8/23 to Milestone <br />b.Contract Goals: <br />i.MBE:1.9% <br />•Met via C Lee,Kennedy Expressline,and 1st Class Logistics <br />ii.WBE:4.1% <br />•Met via Slusser’s,Shoshone Trucking,V&R Trucking <br />c.Original contract amount:$1,594,948.33 <br />d.PM:Zach Hurst <br />e.NTP:9/14/22 <br />f.Project Duration (Days):270 days