Laserfiche WebLink
27.CSO 18 Backwater Gate Replacement <br />a.Award:10/12/2021 <br />b.Contract Goals: <br />i.MBE:1.18% <br />•V&R Trucking 0.16% <br />ii.WBE:4.29% <br />•BUC Construction Supply 48% <br />•State Barricading 0.22%;Total 48.22% <br />c.Contract Amount:$124,980.00 <br />d.PM:Jacob M.Klosinski <br />e.NTP:10/12/2021 <br />f.Project Duration (Days):Completion Date 05/31/2022 (231 Days) <br />g.NOTE:Project completion delayed due to manufacturing and fabrication delays and <br />redirection of contractor personnel to CSO 27/28 Emergency Repair. <br />h.Final Completion anticipated in late August 2022 (concrete lid being refabricated). <br />i.PCA TBD <br />28.North Water Treatment Plant Improvements –No bids on 11.5.2021 <br />a.Path forward:Awarded Open Market contract to Bowen Engineering Corp.on 4.26.2022 <br />b.Contract Goals: <br />i.Divisions A-E MBE:1.2%[met for each division] <br />ii.Divisions A-E WBE:4.3%[not met,GFE demonstrated] <br />iii.Alternates 1-4 MBE:1.2%[not met,GFE demonstrated] <br />iv.Alternates 1-4 WBE:4.3%[met and exceeded] <br />c.Contract Amount:$3,582,800 <br />d.PM:Becca Plantz <br />e.NTP:May 19,2022 <br />f.Project Duration:Spring 2023 <br />29.MPAC Carpet Replacement –Received one (1)quote on 5.10.2022 <br />a.Awarded to Carpet Service Outlet,Inc.on 5.10.2022 <br />b.Contract Goals:There were no goals because there is no unweighted availability for <br />carpet installation in the disparity study. <br />c.Contract Amount: <br />i.Awarded:$173,000 <br />d.PM:Becca Plantz <br />e.NTP:June 22,2022 <br />f.Project Duration:November 2022 <br />30.Ward Bakery <br />a.Masonry (Bid Package 1)