Laserfiche WebLink
<br />24. 2022 Asphalt Materials Bid – Received two (2) bids on 3.22.2022 <br />a. Awarded to Rieth-Riley Construction Co., Inc. on 4.12.2022 <br />b. Contract Goals: <br />i. MBE: 0.13% [met via 1st Class Logistics 0.13%] <br />ii. WBE: 0.18% [met via Montgomery Trucking 0.18%] <br />c. Contract Unit Prices: <br />i. HMA 64-28P Surface: $77/TON <br />ii. HMA 70-22P Surface: $77/TON <br />iii. HMA Binder: $70/TON <br />iv. HMA Base: $49/TON <br />v. CMA Patch: $90/TON <br />vi. Cold Mix: $120/TON <br />vii. Driver & Truck: $122/HR <br />d. PM: Scott Kreeger <br />e. Project Duration (Days): 256 <br /> <br />25. 2022 Contractor Paving, Round 1 – Received two (2) bids on 3.22.2022 <br />a. Awarded base bid and alternate no. 1 to Rieth-Riley Construction Co., Inc. on 4.12.2022 <br />b. Contract Goals: <br />i. Base MBE: 3.92% [met via 1st Class Logistics 4.13%] <br />ii. Base WBE: 5.58% [met via Traffic Control Specialists 2.7%, CE Hughes Milling <br />3.6%, State Barricading 1.1%, Hawk Enterprises, 0.03%] <br />iii. Alt No. 1 MBE: 3.85% [met via 1st Class Logistics 4.1%] <br />iv. Alt No. 1 WBE: 5.48% [met via CE Hughes Milling 7.8%, State Barricading 1%] <br />c. Contract Amount: $1,350,781.84 <br />d. PM: Scott Kreeger <br />e. NTP: <br />f. Project Duration (Days): <br />g. PCA TBD <br /> <br />26. 2022 VPA Athletic Court Renovations – No bids on 4.12.2022 <br />a. Bid award 8/23 to Milestone <br />b. Contract Goals: <br />i. MBE: 1.9% <br />• Met via C Lee, Kennedy Expressline, and 1st Class Logistics <br />ii. WBE: 4.1% <br />• Met via Slusser’s, Shoshone Trucking, V&R Trucking <br />c. Original contract amount: $1,594,948.33 <br />d. PM: Zach Hurst <br />e. NTP: 9/14/22 <br />f. Project Duration (Days): 270 days