Laserfiche WebLink
<br />27. CSO 18 Backwater Gate Replacement <br />a. Award: 10/12/2021 <br />b. Contract Goals: <br />i. MBE: 1.18% <br />• V&R Trucking 0.16% <br />ii. WBE: 4.29% <br />• BUC Construction Supply 48% <br />• State Barricading 0.22%; Total 48.22% <br />c. Contract Amount: $124,980.00 <br />d. PM: Jacob M. Klosinski <br />e. NTP: 10/12/2021 <br />f. Project Duration (Days): Completion Date 05/31/2022 (231 Days) <br />g. NOTE: Project completion delayed due to manufacturing and fabrication delays and <br />redirection of contractor personnel to CSO 27/28 Emergency Repair. <br />h. Final Completion anticipated in late August 2022 (concrete lid being refabricated). <br />i. PCA TBD <br /> <br />28. North Water Treatment Plant Improvements – No bids on 11.5.2021 <br />a. Path forward: Awarded Open Market contract to Bowen Engineering Corp. on 4.26.2022 <br />b. Contract Goals: <br />i. Divisions A-E MBE: 1.2% [met for each division] <br />ii. Divisions A-E WBE: 4.3% [not met, GFE demonstrated] <br />iii. Alternates 1-4 MBE: 1.2% [not met, GFE demonstrated] <br />iv. Alternates 1-4 WBE: 4.3% [met and exceeded] <br />c. Contract Amount: $3,582,800 <br />d. PM: Becca Plantz <br />e. NTP: May 19, 2022 <br />f. Project Duration: Spring 2023 <br /> <br /> <br />29. MPAC Carpet Replacement – Received one (1) quote on 5.10.2022 <br />a. Awarded to Carpet Service Outlet, Inc. on 5.10.2022 <br />b. Contract Goals: There were no goals because there is no unweighted availability for <br />carpet installation in the disparity study. <br />c. Contract Amount: <br />i. Awarded: $173,000 <br />d. PM: Becca Plantz <br />e. NTP: June 22, 2022 <br />f. Project Duration: November 2022 <br /> <br /> <br />30. Ward Bakery <br />a. Masonry (Bid Package 1)