Laserfiche WebLink
<br />Page 2 <br />(Exhibit A –Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />Part Time Construction Administration/Observation of the Contractor during construction is also <br />included. <br />A1.01 Study and Report Phase <br />A. Engineer shall: <br />1. Consult with Owner to define and clarify Owner’s requirements for the Project and available <br />data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />3. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental assessment. <br />4. Identify and evaluate one (1) alternate solution available to Owner and, after consultation <br />with Owner, recommend to Owner those solutions which in Engineer’s judgment meet <br />Owner’s requirements for the Project. <br />5. Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, and <br />related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />a. Traffic signal warrant study for intersection of Angela Boulevard and Joyce Drive/Duey <br />Street taking into consideration the existing intersection volume. <br />1) This analysis will determine if IMUTCD Warrant #1, Eight-Hour Vehicular Volume, <br />Warrant #2, Four-Hour Vehicular Volume, Warrant #3, Peak Hour Vehicular <br />Volume, and/or Warrant #4, Pedestrian Volume is satisfied. <br />2) Engineer will prepare a report in memo format, which will include the findings of the <br />traffic signal warrant analysis. <br />b. If required by Owner, HAWK signal warrant analysis, in the vicinity of Joyce <br />Drive/Duey Street taking into consideration the existing intersection traffic volume. <br />1) This analysis will determine if the IMUTCD criteria for a HAWK signal is satisfied. <br />2) Engineer will prepare a report in memo format, which will include the findings of the <br />HAWK signal warrant analysis. <br />c. Prepare conceptual sidewalk layout along both sides of Angela Boulevard from <br />Twyckenham Drive to SR 23 and determine preliminary right of way impacts.