Laserfiche WebLink
Version 6-8-2017 <br />19 <br />IV.Cooperate: with the LPA in dealing with the various Federal, State and Local Agencies <br />having jurisdiction over the project. <br />V.Assist the LPA and INDOT in obtaining from the Contractor a list of his proposed suppliers <br />and sub-contractors. <br />VI. Assist the LPA and INDOT in obtaining from the Contractor additional details or information <br />when needed at the job site for proper execution of work. <br />VII.Equipment: Furnish all equipment necessary to sample and test materials in accordance with <br />INDOT’s procedures. <br />VIII.Samples: Obtain field samples of materials delivered to the site as required by the State and <br />deliver such samples to the appropriate INDOT laboratory office. <br />IX.Shop Drawings: <br />a.Receive shop drawings and falsework drawings. Check for completeness and then <br />forward to LPA personnel for approval. <br />b.Review approved shop and falsework drawings, specifications and other submissions, <br />record receipt of this data, maintain a file of all drawings and submissions, and check <br />construction for compliance in accordance with the Contract Documents. <br />c.Alert the Contractor’s field superintendent when it is observed that materials or <br />equipment are being or about to be used or installed before approval of shop drawings <br />or samples, where such are required, and advise the LPA and INDOT when he <br />believes it is necessary to disapprove work as failing to conform to the Contract <br />Documents. <br />X.Review of Work, Inspection and Tests: <br />a.Conduct on-site inspections for the LPA of the work in progress as a basis for <br />determining that the project is proceeding in accordance with the Contract <br />Documents. <br />b. Provide on-site acceptance testing of materials in the manner and extent prescribed by <br />the latest edition of the Indiana State Highway Commission Construction Manual and in <br />accordance with current accepted practices. <br />c. Accompany visiting inspectors, representing Local, State or Federal Agencies having <br />jurisdiction over the project, and report details of such inspection to the LPA and <br />INDOT. <br />d. Verify that required testing has been accomplished. <br />XI.Modification: Consider and evaluate the Contractor’s suggestions for modifications in drawings <br />and/or specifications and report them with recommendations to the LPA and INDOT.