My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Contract - Construction Inspection Services for the Coal Line Trail – USI Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Contract - Construction Inspection Services for the Coal Line Trail – USI Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 1:56:17 PM
Creation date
9/13/2022 1:55:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 6-8-2017 <br />20 <br />XII.Records: <br />a.Prepare and maintain at the job site orderly files of correspondence, reports of job <br />conferences, shop drawings and other submissions, reproductions of original Contract <br />Documents, including all addenda, change orders and additional drawings subsequent <br />to the award of the Contract, progress reports and other project related documents. <br />b.Keep a diary or log book, recording hours on the job site, weather conditions, list of <br />visiting officials, decisions, general observations, and specific observations with regard <br />to test procedures. Upon request furnish copies of such a diary or log book to the LPA. <br />c.Maintain for the LPA, a record of names, addresses and telephone numbers of all <br />sub- contractors and major material suppliers. <br />d.Maintain a set of drawings on which authorized changes are noted, and deliver to <br />the LPA upon request, but in any event at the completion of the project. <br />e.Prepare the Final Construction Record and Final Estimate as required by the INDOT <br />and the LPA. <br />XIII.Reports: Furnish to the INDOT and the LPA at periodic intervals, as required, progress reports of <br />the project, including the Contractor’s compliance with the approved construction schedule.\ <br />XIV.Progress Estimates: Prepare progress estimates for periodic partial payments to the Contractor and <br />deliver to the LPA and INDOT for review and processing. The payments to the Contractor will be <br />based on estimates of the value of work performed and materials complete in place in accordance <br />with the Contract. <br />XV.Project Responsibility: The RPR will be responsible for the documentation of pay quantities and <br />estimates, and the maintenance of appropriate records related to the construction of this project. <br />XVI.Work Schedule and Suspension: The consultant’s crew will be required to regulate their work <br />week to conform to the contractor’s hours in accordance with the directions of the INDOT’s Area <br />Engineer. If work on the construction project is suspended all matters concerning contract <br />compliance and administration are complete, the services of the consultant may also be suspended <br />without cost to the project. <br />XVII.Contract Administration: The CONSULTANT will administer the contract in accordance with <br />INDOT’s procedures. <br />XVIII.Conflict of Interest: The CONSULTANT acknowledges and agrees that the CONSULTANT, a <br />firm associated with the CONSULTANT or an individual associated with the CONSULTAN T <br />cannot accept or perform any work (including but not limited to construction engineering, <br />production staking, falsework drawings, shop drawings) for the contractor, material supplier of <br />the contractor or for any of the contractor’s subcontractors on this project. For purposes of this
The URL can be used to link to this page
Your browser does not support the video tag.