My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - USI Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Proposal - Coal Line Trail, Phase IIB (CE Services) Proj No. 122-035 - USI Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:30:52 PM
Creation date
8/23/2022 1:30:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 City of South Bend | Coal Line Trail, Phase IIB | Des. #2200199 <br />Project Approach <br />Project Overview <br />This phase of Coal Line Trail will rehabilitate the existing abandoned railroad bridge crossing <br />the St. Joseph River and convert it into a multi-use path. This will consist of removing the old <br />railroad track and rehabbing the existing girders. Existing structural steel will be field cut and <br />rehabbed with new elastomeric bearing pads being installed. Bridge deck will utilize a concrete <br />bridge deck with bridge expansion joints and ornamental railing. Existing piers will be rehabbed <br />by utilizing pneumatically placed mortar and cracks in the piers will epoxy injected. Class 1 <br />riprap will be placed around the piers and abutments for scour protection. The project will also <br />construct a plaza on the West Bank connecting the Coal Line Trail to the existing Riverside Trail <br />on the west side of the St. Joseph River and will connect with Coal Line Trail Phase IIA to the <br />east. Project amenities will include a bench, lighting, drinking fountain, 4 bike racks with repair <br />station, trash receptacle, bollard, trees, and shrubs. <br />Project Schedule <br />This project is scheduled to be bid on the INDOT letting in September 2022. <br />Maintenance of Traffic (MOT) <br />The project will be constructed off the roadway but could impact traffic on Riverside and <br />North Shore Drive. It will be especially important to maintain traffic for local businesses and <br />residences who do not have additional avenues to access their homes and facilities on North <br />Shore Drive. Chris will manage close communication and coordination with everyone involved - <br />the Owner(s), the contractor, and subcontractors - to provide delivery without delay! <br />Looking Southeast at the North Face of <br />the Coal Line Trail Bridge <br />Looking North at the South Face of <br />the Coal Line Trail Bridge <br />Looking East over Coal Line Trail Bridge
The URL can be used to link to this page
Your browser does not support the video tag.